GIF++ installation and schedule meeting

Europe/Zurich
892/1-D20 (CERN)

892/1-D20

CERN

45
Show room on map
Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)

Attendance:
————

Giuseppe (DT-DD)

Mara C. (DT)

Katerina K. (CMS-CSC)

Sergio (CMS-DT)

Matteo (CMS-RPC)

Vidyo:
----------

Lisa B. (CMS-GEM)

Daniele Fasanella (CMS-DT)

 

There are minutes attached to this event. Show them.
    • 09:15 09:25
      Review of last week operation 10m

      Drop in atmospheric  pressure on Sunday. Also seen on REMUS ?


      Installation of the cables for second DT chamber yesterday went well.
      Henso removed one chamber,  CMS-CSC chamber installation CMS-EM11Spare.
       

    • 09:25 09:35
      Plans for upcoming week 10m

      MAD installation  POSTPONED - No new time known.

      Downstream :  Filter 22 for the next days.

      Plan for next week :   no opening of bunker.
      Planning for today :

          - EP-DT : Short access and short scan   : after meeting
          - Downstream Filter Scan DT    : 11- 17h
          - Upstream Filter Scan CMS-RPC   : 11h - 17h
          - Short access at 17h.

       

       

    • 09:35 09:50
      Planning for the comming weeks 15m
      • Report from Downstream Field 5m
      • Report from Upstream Field 5m
    • 09:50 10:00
      New requests for tests at GIF 10m

      introduction, goal of the test, plan, needs

      ALICE electronic board to return for 1-2 weeks. we will try to host it in the upstream area this time, possible hosted by the ATL-MM  - no news

       

       

    • 10:00 10:15
      Infrastructure & Upgrades to the Facility 15m

      Improvements needed or planned for the facility.

      Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)

      Ongoing Projects :

       

      Connection of gas system values to GIF Control System :

      Start of connection for ATL-TGC, CMS-RPC. All cables installed on gas system side
      Connection to GIF control system scheduled for this Friday.

      • Material Door Installation 5m
      • Upcoming Interventions 5m

        22.11  AUG/ALG buttons not operational.

        Cuurently no UPS in EHN1. If power cut -> evacuate EHN1

        ANNUAL AUG TEST will be the 9. Jan.

        Local AUG : 5-7 March

      • Requirements during YETS and LS2 5m

        YETS :  Cooling stop for basically the full end of the year stop.
        However, minimal cooling will be provided by EN-CV via special solution.

    • 10:15 10:25
      Announcements 10m

      You can subscribe to the calendar with the following link (to be added in you calendar application)
      http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics

      • IMPACTS for 2018 5m

        Guidelines for filling in IMPACT requests

        General Guideline : One IMPACT per setup.

        • two chambers on individual supports -> 2 IMPACT declarations
        • multiple chambers swapped on same or similar support -> one IMPACT declaration
        • basically, if you need two locations, please make two IMPACT declaration (clone)

        Each Setup should have IMPACT label attached with number.
        Attached documents : CAD file  or  picture.
        Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).

        NEW IMPACT needed for 2018. (All current IMPACTS will expire at Saturday 23.December)

        Special IMPACT needed for Christmas Closure.

      • New Announcements 5m
      • AOB 5m

        Gas  bill 2016 : please note that the EP-DT budget for GIF does not cover consumables.
        Gas used at the GIF++ will have to be paid by the consumer. We will start the TID's soon.

        Question from Barbara : How is the Argon/CO2 provided, and will this be charged to the user.
        To be clarified with Roberto & Fred.

        O2 contamination study - Roberto to comment.