Jun 26 – 29, 2018
Ambassador Hotel Hsinchu
Asia/Taipei timezone

Session

Projects and status reports II

Jun 27, 2018, 8:30 AM
Ambassador Hotel Hsinchu

Ambassador Hotel Hsinchu

Hsinchu, Taiwan

Conveners

Projects and status reports II

  • Morten Jensen (European Spallation Source)

Presentation materials

There are no materials yet.

  1. Michael Betz (LBNL)
    6/27/18, 8:30 AM
    Status reports and projects
    Oral presentation

    I will present the status of the RF systems at the Advanced Light Source (ALS) and the progress made in commissioning the new Storage Ring RF system.
    Additionally, I will report on the conceptional design of the ALS-U accumulator RF system and the VHF solid state amplifier for the LCLS-II Gun B collaboration.

    Go to contribution page
  2. Ms Anahid Yeremian (SLAC National Accelerator Laboratory)
    6/27/18, 9:00 AM
    Status reports and projects
    Oral presentation

    A second X-ray free electron laser facility, LCLS-II, is being constructed at SLAC. LCLS-II is based on a 1.3 GHz, 4 GeV, continuous-wave (CW) superconducting linear accelerator, to be installed in the first kilometer of the SLAC tunnel. Multiple types of high power RF (HPRF) sources will be used to power different systems. The main 1.3 GHz linac will be powered by 280 1.3 GHz, 3.8 kW solid...

    Go to contribution page
  3. James Rose (NSLS-II, Brookhaven Lab)
    6/27/18, 9:30 AM
    Status reports and projects
    Oral presentation

    The NSLS-II has been operating for four years with two CESRb type SRF cavities powered by 300 kW klystron transmitters. As the operating current is raised from 375 mA operations today to the design value of 500mA, and additional insertion devices increase the energy loss per turn we will reach a limit in installed RF power by 2020. A new project to add a third SRF system to provide power for...

    Go to contribution page
Building timetable...