Installation of TPSC4 (Protection Shield for Septum Magnet, Carbon) in the SPS tunnel upstream of the QFA.41810 increasing the protection of the MSE and extraction line in LSS4. The TPSC4 consists of a 1.735m vacuum vessel which incorporates the main diluter, vacuum pumping, beam screen and motorisation system. The position of the TPSC4 shall be controlled independent of the MSE / TPSG4 girder.
Installation according to LS2 planning.