Description of the powering changes required to the LT and LTB lines during LS2. All systems will be installed in building 363.
PLAN: 10320, 11227
All converters linked to the Booster injection corrector and quadrupole magnets located in the room 361-1-012 (BCER) will have to be upgraded for the LIU project during LS2. This ECR concerns the installation of 87 operational and nine spare power converters.
PLAN numbers: 10304, 10307, 10308, 10314.