LIU - Planning & Installation meeting

→ Europe/Zurich
376/1-020 (CERN)

376/1-020

CERN

16
Show room on map
    • 16:00 → 16:05
      Approval of the minutes 5m
      Speaker: Julie Coupard (CERN)
    • 16:05 → 16:10
      LIU-PLI Follow-up 5m
      • Follow-up on the SRRs and ECRs
      Speaker: Julie Coupard (CERN)
    • 16:10 → 16:25
      LIU-SPS ECR SPS-ZS-EC-0001 (EDMS 1949753) Installation of new ZS in the SPS LSS2 extraction channel during LS2 15m

      In order to reduce high sparks rate and vacuum activity with LHC beams in the LSS2 ZS electrostatics septa, a new layout has been proposed.
      The upgrade of ZS can be split into two categories. The first one is vacuum improvements to keep the pressure rises limited with LHC beams in the SPS by placing high capacity vacuum pumps directly on the ZS. The second one is reduction of the beam impedance, which aims at avoiding the creation of an electron cloud in the former pumping modules by replacing them with ZS interconnects and by reducing the beam impedance of the ZS septa themselves.

      Speaker: Bruno Balhan (CERN)
    • 16:25 → 16:40
      LIU-SPS ECR SPS-TPSG6-EC-0001 (EDMS1935856) Installation of TPSG6 in the SPS LSS6 extraction channel during LS2 15m

      In order to increase the protection of the MST and MSE extracting septa installed in the LSS6 SPS extraction channel, it is required to lengthen the actual TPSG6.
      The future TPSG6 assembly will consist of three separated 1850 mm vacuum vessel (instead of 2 presently) each equipped with 1750 mm diluter, cooling and vacuum pumping. A modification of the remotely moving girder is as well required.

      Speaker: Bruno Balhan (CERN)
    • 16:40 → 16:45
      AoB 5m