LIU - Planning & Installation meeting

→ Europe/Zurich
376/1-020 (CERN)

376/1-020

CERN

16
Show room on map
    • 16:00 → 16:05
      Approval of the minutes 5m
      Speaker: Julie Coupard (CERN)
    • 16:05 → 16:10
      LIU-PLI Follow-up 5m
      • Follow-up on the SRRs and ECRs
      Speaker: Julie Coupard (CERN)
    • 16:10 → 16:25
      LIU-SPS ECR SPS-LJ-EC-0014 (EDMS1936241) LSS1 Vacuum Layout after LS2 15m

      Within the framework of the LIU – SPS beam dump system upgrade, LSS1 will be reconfigured starting from half period 116 up to half period 119. The document describes the detailed vacuum layout of this part of the SPS ring.

      Speakers: Chiara Pasquino (CERN), Diogo Miguel Dos Santos Mendes Vilar Murteira (Universidade de Lisboa (PT))
    • 16:25 → 16:40
      LIU-SPS ECR SPS-R-EC-0006-00-10 (EDMS 1963473) BA1 reconfiguration after relocation of SPS beam sumping system to LSS5 during LS2 15m

      As part of the LIU-SPS project, the SPS internal beam dump will be relocated from SPS LSS1 to LSS5 during LS2. This ECR summarises the modifications in BA1 surface building induced by the removal of the horizontal and vertical kicker high voltage pulse generators and their electronics and controls.

      Speakers: Etienne Carlier (CERN), Laurent Sylvain Ducimetiere (CERN), Pieter Van Trappen (CERN)
    • 16:40 → 16:45
      AoB 5m