LIU - Planning & Installation meeting

→ Europe/Zurich
376/1-020 (CERN)

376/1-020

CERN

16
Show room on map
    • 16:00 → 16:05
      Approval of the minutes 5m
      Speaker: Julie Coupard (CERN)
    • 16:05 → 16:10
      LIU-PLI Follow-up 5m
      • Follow-up on the SRRs and ECRs
      Speaker: Julie Coupard (CERN)
    • 16:10 → 16:25
      LIU-PSB ECR CPS-LJ-EC-0004 (EDMS1688400) Partial Disassembly of LINAC 2 15m

      This document concerns the disassembly of the Linac2 transfer line from the end of the DTL cavities, DTL cavities not included, up to the LT.BHZ20 magnet. The aim is to liberate space for new items installation (bldg.363/R-402), described in the ECR: CPS-LJ-EC-0002 "Connection of the Linac4 to the LT.BHZ20"

      Speakers: Anne Funken (CERN), Aurelio Berjillos Barranco (CERN), Damien Grenier (CERN)
    • 16:25 → 16:40
      LIU-PSB ECR PSB-MK-EC-0002 (EDMS1955075) New PS Booster Extraction Kicker Magnet BE.KFA14L1 15m

      After LS2 the PSB will operate at an extraction energy of 2GeV and for this reason the extraction kicker has to be upgraded. In order to achieve this new magnets are constructed, based on the existing design, but with improved performance by changing the ferrite cross sectional area.

      Speakers: Luc Sermeus (CERN), Wim Weterings (CERN)
    • 16:40 → 16:55
      LIU-PS ECR PS-BWSRB-EC-0002 (EDMS 1962139) New Rotatable Beam Wire Scanners Installation in the PS Ring 15m

      It is proposed to replace 4 existing wire scanners in sections SS64, SS65, SS68 and SS85 by 4 rotatable beam wire scanners of new generation. One scanner of this new generation was installed in section 54 during YETS 2017-2018. These new scanners are used to measure and reconstruct the beam profile. The installation will take place during the LS2 as part of the LIU project.

      Speakers: Dmitry Gudkov (CERN), Raymond Veness (CERN), William Andreazza (CERN)
    • 16:55 → 17:10
      LIU-SPS SRR SPS-LJ-EC-0003 (EDMS1574176) LSS5 configuration after relocation of the SPS Beam Dumping System during LS2 15m

      Space reservation request for LSS5 of the SPS, for positions 51610 through 52010. This SRR is part of the LHC Injectors Upgrade (LIU) framework, which covers SPS, and seeks to prepare the reliable delivery of the required beams to the LHC, to meet the goals of the High Luminosity LHC (HL-LHC) project.

      Part of the LIU-SPS project concerns the upgrade of the SPS Beam Dump system, which is planned to be relocated from LSS1 to LSS5 with upgraded kicker system and dump block which will allow extraction of the full range of beam energies onto a single dump block.

      With respect to the previous approved version 1.0, this SRR reserves also space for the relocation of the BSRT instrument actually located in half period 520 to half period 516 and for an upgraded version of the rotational wire scanner in half period 519.

      Reservation of space for fire doors in half periods 517 and 520 and the relocation of BCTDC and BCTFS in half period 519 after installation of BCTW during EYETS 2016-2017 are also described.

      Speaker: Etienne Carlier (CERN)
    • 17:10 → 17:20
      AoB 10m