MEDICIS coordination meeting
26-1-022
CERN
MEDICIS coordination - 12 July
Eric - Elodie - Roberto - Karl - Laura - Moazam - Julien - Thierry - Giordano - Fabio
149Tb irradiation/collection
644M target produced - Ta double density - 25mu - Re ion source - no MM
irradiation : most likely sunday 22nd
option open : HIE “unexpected” interruption : wednesday/thursday
remote handling : no problems : switch to be replaced.
ventilation : 1 day stop 24th July :
technical stop for 1 week at MEDICIS.
request to stop laser installation : 1 week laser tube installation.
mobile network upgrade :
Pascal : Hall probe : works in bunker, problem 25m cable ?
to be followed
spectroscopy : is corrected for 155Tb : now matching figures
permanent Ge dectector to be installed in the coming weeks.
baseline irradiation : HRS, deflected beam, focused, during setting up of Isolde.
169Er :
Roberto : source importation : 29th June - 5th July at ILL.
arrived at CERN 11th July -
deconditioning of the source to transfer of Ta631M
Dose : less 10uSv.
contamination of tools and operator.
Elodie : problem of contamination when vial was cut. problem of contamination in plastic vial.
will ask ILL : Roberto missed the transfer.
feedback on the cause of contamination / consequence on mode operatoire/equipment.
declaration of incident A2.
spectroscopy
target was put on MEDICIS Front End :
1.5ml of acid in target : was too much for MEDICIS - will evaporate outside
AOB
phase I : closed
phase II/consolidation -
Operation : sample foil could not be retrieved -
use camera / feel the problem.
MoU : Lausanne Hospital has decided to sign the MoU. Geneva should follow up.
two expression of interest : Rotterdam (ERASMUS) + Munich Hospital.
Irradiation for winter physics : can be done according to schedule
discussion of separation of non medical isotopes : september board
bring at some point : user based “babysitting” of implantation.