Suspicion : Source ON light, but source actually OFF - to be checked, and follow up with VF if correct.
Next week : additional access Tuesday afternoon.
Filter Scan today :
----------------------
Upstream :
CMC-RPC 3h source OFF, after meeting then filter 46 during CSC scann.
ATL-MM & CMS-RPC : until midnigth scan 22-400
Downstream :
CMS-DT 15h - 30min (basically full range)
CMS-CSC 15h30 - 21h hours (6.9)
ATL-RPC - installation done
ATL-R2 - coming next week
CMS-CSC - in place
EP-DT1 - in place, some problems, to be fixed today
ATL-sTGC - no report
(ATL-MM installed for one week)
LHCb - coming for 3 week, not installed yet
ATL-sMDT - system being prepared,
EP-DT2 - installed, ready
CMS-RPC - trolly 3 and 1 installed
CMS-RPC2 to come in 2 weeks, need to move ATL-RPC for installation
Improvements needed or planned for the facility.
Ongoing Projects :
NEW retrieval of TIMBER values : Work in progress, but already available in beta version
https://epdtdi-pytimber.web.cern.ch/app/gifpp (also linked from main GIF page.
Additional values need to be collected/republished ?
- REMUS - to be included in GIF Display
- XTDV - to be included in pytimber only
DIP Bridge between TN and GPN : Finally on real machine (not VM) asnd located in the CCC rack room. In case of failure, we call the CCC/TI operator on 72201, and ask him to contact the "ICS CONTROL PIQUET" for this.
- Trolley to be provided for material transport
- Gas zone hot, tend to be opened
You can subscribe to the calendar with the following link (to be added in you calendar application)
http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics
Update on the SPS Planning
Guidelines for filling in IMPACT requests
General Guideline : One IMPACT per setup.
Each Setup should have IMPACT label attached with number.
Attached documents : CAD file or picture.
Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).
NEW IMPACT needed for 2018. (All current IMPACTS will expire at Saturday 23.December)
Special IMPACT needed for Christmas Closure.