CERN, bat 2 R-014 To join the telephone conference, click here: https://audioconf.cern.ch/call/0165202 To dial in to the conference: a. Dial +41 22 7676000 b. Enter access code 0165202
Production and PASTE Meeting, 24th November 2009, CERN Chair: A.Tsaregorodtsev Minutes: S.Paterson CERN: P.Charpentier, J.Closier, Z.Mathe, S.Paterson, R.Santinelli, F.Stagni Phone: V.Fernandez, R.Graciani, E.Lanciotti, R.Nandakumar, A.Tsaregorodtsev, A.Zhelezov Apologies: A.C.Smith 0. Ongoing Action List #12524 - Ricardo has installed the updated binaries on the new development host. MySQL is now installed correctly and all tables / services are in place. Joel was asked to add the service installation to the VO-box templates. ( ACTION: Joel ) #12525 - New DIRAC certification system - a new machine of the same profile as volhcb12 was desired for certification of the next DIRAC release. #12526 - The request was made to replace volhcb02 and volhcb06. This becomes important since we require a new file server for logs. 1. Production Status Report - Current productions, LHC collisions data Stuart summarised that the reconstruction of the first beam data was launched on Sunday after the relevant Brunel release was made. Yesterday the first collision data was reconstructed ~1hr after becoming available at the pit. In other news the 'Data Recovery Agent' has been running without intervention using the Moore and physics stripping as a test case (5589 and 5600), these productions are arriving at 100% of data processed. Once this test is successfully complete the agent will start to run on all data processing productions. One important comment is that the reschedule operation should be abandoned for shifters as soon as possible. Operationally we are still suffering from the 134 error and the Gaudi finalisation crash (affecting ~10% of jobs). The new LBSCRIPTS package allows us to run in debug mode at Grid sites so will hopefully shed more light on this. An alarm ticket was submitted yesterday due to the 3D streaming to Tier-1 sites not propagating our database tags. It was agreed that sites would support 24/7 the conditions database service but this was not viewed as part of the set. Joel conveyed that the alarm ticket was assigned to LHCb (after being submitted by LHCb) and this is being discussed. Some problems after NIKHEF dCache upgrade, users in multiple VOs statically mapped i.e. storage not VOMS aware. Philippe raised the issue of 100TB becoming available for our space tokens at CERN. - BK processing pass modification proposal See proposal attached to the agenda. This allows a tighter coupling between the simulation conditions and processing pass and will streamline the request interface. If backwards compatibility can be preserved this will be highly desirable. - BK data taking conditions The data taking conditions name will now be automatically created by the BK such that it is not ambiguous. It was noted that this change should be carefully coordinated with the ongoing production activity. The full minutes of the meeting were circulated by mail. - CREAM CE SAM tests Roberto mentioned that the CREAM CEs are not published in the BDII in the same way as other LCG CEs and therefore SAM results are not being published to the SAM DB. A change can be made to the client to update the results (pursue with low priority). - SW area disk quotas, SW cleaning Joel confirmed that the cleaning cannot easily be performed for the LCG external distributions. At CERN this gained us 11GB. Since a cleaning procedure is not on the horizon it was suggested to update the space requirement to 100GB. - Reconstruction Production Requests monitoring The percentage field is not calculated because Alexey is still waiting for an efficient way to retrieve the total number of events for a given input data query. 2. DIRAC Release Update - v4r21(p1) release v4r21 added fixes from Zoltan for the BK GUI. The p1 release was to add the checksum fix from Andrew since some DMS commands were not working as expected. Joel will add this to the release area. 3. DIRAC Tasks - SVN migration o release tagging, building and installion scripts Joel confirmed that tags can be provided and LHCbDIRAC can be built. Ricardo commented that tools are being provided to prepare from tarballs the SVN DIRAC distributions. o Subsystems migration status Everything in the LHCb DIRAC section should be updated already, testing is required in development. Developers are encouraged to test all subsystems on volhcb12. 4. AOB None
There are minutes attached to this event. Show them.
    • 09:30 → 10:00
      Ongoing actions 30m
      The task list is available via the Savannah DIRAC group ( Task List ). If you are not already registered please do so at the Savannah page. In order to streamline the time spent during PASTE on the actions list only tasks in the status 'ToBeDiscussed' will be discussed there. In case some actions fall by the wayside they will automatically be updated to this status. Therefore the action assignees should take care to update this. For ongoing actions it is advantageous to report any progress in the Savannah tasks each week.
    • 10:00 → 10:30
      Production issues 30m
      - Current productions, LHC collisions data - Bookkeeping processing pass proposal - CREAM CE SAM tests - SW area disk quotas, SW cleaning - Reconstruction Production Requests monitoring
      document
    • 10:50 → 11:10
      DIRAC Release Update 20m
      - v4r21(p1) release
    • 11:30 → 12:00
      DIRAC tasks 30m
      - SVN migration o Development (volhcb12) System status o release tagging, building and installion scripts o Subsystems migration status - Infrastructure monitoring (SAM,SLS,Dashboard) - Framework status - Bookkeeping status - WMS status - DMS status - Production Management status - VO-boxes - Web Portal - Services deployment ( hardware, configuration ) - Documentation
      document
    • 12:20 → 12:30
      AOB 10m