Production and PASTE Meeting, 8th December 2009, CERN Chair: A.Tsaregorodtsev Minutes: S.Paterson CERN: J.Closier, S.Paterson, R.Santinelli, A.C.Smith, A.Tsaregorodtsev, F.Stagni Phone: R.Nandakumar, M.Sapunov Apologies: P.Charpentier, Z.Mathe 0. Ongoing Action List #12165 - Roberto - no progress yet. Joel was asked to document a twiki with instructions to the operator for each alarm. #12383 - Resource status monitoring - it was agreed to aggregate all DIRAC information in one place such that it can be pushed to external sources as necessary #12526 - The new production machines have been requested but not yet deployed. Testing will occur in the new year. Joel confirmed that the new LogSE is now available. 1. Production Status Report - Current productions, LHC collisions data Stuart summarised that the reconstruction of the collisions data was launched on Sunday and the reprocessing (after the v35r10p1 Brunel release) was completed within an hour yesterday. The BK data taking conditions were updated by hand prior to launching the productions. In other news the 'Data Recovery Agent' has been running without intervention using the Moore and physics stripping as a test case these productions have achieved 100% of data processed (except for one file lost by RAL). The final merging productions have been flushed. The 134 error was reproduced at CERN and the problem was alleviated at some sites by unsetting the MALLOC_CHECK variable. The 134 error does persist at some sites (systematically) so the underlying problem should still be investigated. Andrei agreed and commented that 25% of the current resources are wasted due to this problem and the other supposed bug in the finalisation of Gaudi that we are also trying to reproduce. Vladimir reported that at some sites this reaches 100%. The Castor migration time is causing a random delay for some files. Andrew commented that the trigger is 300GB or 8hrs pending but the Castors could tune the waiting time during this period. 2. DIRAC Release Update - v4r21(p1,2,3) release Minor bug fixes to dirac-architecture / GaudiApplication for MALLOC_CHECK. 3. DIRAC Tasks - Framework status Being tested on volhcb12. - Bookkeeping status Was updated and running on volhcb12. - WMS status Being tested on volhcb12. - DMS status No reshuffling there was required. - Production Management status Andrew commented that the production management system is reshuffled and LHCb specific components were refactored into LHCbDIRAC. This is now running on volhcb12. - VO-boxes No updates required. - Web Portal Being split into DIRAC and LHCb specific components. The reintegration / deployment effort is ongoing and will be tested on volhcb12. - Services deployment ( hardware, configuration ) - Documentation It was agreed to take the time to extensively test the pre-release in certification before Christmas and release the SVN based DIRAC in production. Roberto mentioned that the site status board was updated. A fine grained view of the production status is available there by job type. SAM jobs are now linked with results. This will be linked from the DIRAC web portal. The HC testing activity was discussed and if these results are to be exposed we should carefully discuss the failure cases. Periodic infrastructure tests framework should be provided in DIRAC. ( ACTION: Stuart, Roberto ) 4. AOB Participation to the EGEE User Forum will be discussed offline once the most suitable tracks are identified. It was suggested to have a DIRAC stand and this will be investigated.
There are minutes attached to this event. Show them.
    • 09:30 → 10:00
      Ongoing actions 30m
      The task list is available via the Savannah DIRAC group ( Task List ). If you are not already registered please do so at the Savannah page. In order to streamline the time spent during PASTE on the actions list only tasks in the status 'ToBeDiscussed' will be discussed there. In case some actions fall by the wayside they will automatically be updated to this status. Therefore the action assignees should take care to update this. For ongoing actions it is advantageous to report any progress in the Savannah tasks each week.
    • 10:00 → 10:30
      Production issues 30m
      - Current productions - LHC collisions data
    • 10:50 → 11:10
      DIRAC Release Update 20m
      - v4r21p2,p3 release
    • 11:30 → 12:00
      DIRAC tasks 30m
      - SVN migration o Development (volhcb12) System status o release tagging, building and installion scripts o Subsystems migration status - Infrastructure monitoring (SAM,SLS,Dashboard) - Framework status - Bookkeeping status - WMS status - DMS status - Production Management status - VO-boxes - Web Portal - Services deployment ( hardware, configuration ) - Documentation
    • 12:20 → 12:30
      AOB 10m
      - participation to the EGEE User Forum