- Compact style
- Indico style
- Indico style - inline minutes
- Indico style - numbered
- Indico style - numbered + minutes
- Indico Weeks View
Open ACTIONS from previous meetings:
IR4 Layout & BPW ECR
• Check latest layout (will be uploaded to indico) & report back with comments at next meeting - ACTION: ALL
ACTIONs: Thibaut
• Circulate to WP13 members for comments
• Check activity in PLAN for BPM for TANB has been declared
• Add collaborators in ECR - mentioning delivery in 2020
IR4 Optics:
• WP13 to check impact of this new optics to try to optimise instrument locations for HL
Update on Fluorescence :
ACTIONs: Stefano
• Check estimated number of photons per second
• Find optimal camera/intensifier settings with Enrico
• Take data at injection where SR is not an issue
HEL-BPM:
ACTIONs: Lars
• Check minimum modulation intensity (few %) to have signals comparable to protons at BPM + simulate with electron to check there is no demodulation
• Check button values, including large
• Check strip lines
• Check transverse impedance - ACTION: IWG (Lars)
CRYO-BPM:
• Official review report still to be written - ACTION: Rhodri - Written and comments being collected
• Need number for tolerance in Tungsten block - ACTION: FLUKA (Michal)
• Transverse impedance to be checked - ACTION: IWG (Michal)
• Installation sequence to be clarified with WP3- ACTION: Gerhard
• Feedthroughs - urgent to qualify & produce MS-IT plan with procurement. ACTION: Manfred, Michal & Rhodri
• Formal clarification required that VSC provide welding machine and establish procedure - ACTION: Gerhard
• Engineering & Technical specification required: ACTION: Gerhard & Michal