New 1st Splitter being designed
New part after 600m of TT21
- No space for BSGV.220075 - SEM
BDF line requirements
- 6 new profile and position monitors in existing TT21 (in 4 different locations)
- 10 new profile and position monitors in new BDF line (in 5 different locations)
- 10 measurements per spill - 0.1 Hz
- 1 Full 2D monitoring, screen-type
- In new line before dilution magnets
- 1 beam current monitor
- In new line before dilution magnets
- A target beam monitoring system
- Can be in vacuum
- Placed at suitable location after the dilution kickers where dilution pattern can be resolved wrt beam size
- Beam loss monitors, 9 in total
- Needs to be interlocked with 10ms reaction time
To do by ABT:
- Specify explicitly where position is required & where beam profile is required
- Add beam size at each location in table of requirements
- Add expected vacuum level in the line
- Resolution required on 2D monitor & furthest location from target where this could be placed
To do by BI:
- Cost estimate ASAP (Rhodri)
- Base on SEM, BTV, BSI, BLM
- Manpower estimate not required for the moment
- Write-up for BI contribution using OVERLEAF