GIF++ installation and schedule meeting

Europe/Zurich
892/1-D20 (CERN)

892/1-D20

CERN

45
Show room on map
Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN), Federico Ravotti (CERN)
There are minutes attached to this event. Show them.
    • 1
      Preparation for the Christmas Shutdown - current situation

      Current Situation

      Upstream :

      =========
      CMS-CSC: small chamber hosted on LHCb setup at 3.5m  (flushing, ready for Christmas)
      ALICE TPC at 2 m unshadowed  - out / back on 09.01.2019
      EP-DT2 : 5m next to CMS-RPC  (to be turned OFF soon)
      CMS-RPC : Trolley 1 at 5m, Trolley 3 at 4m  (Off since Tuesday)
      ATLAS-sTGC : 3.5m   - (CO2 flushing, HV OFF)

      Downstream :
      ==========
      CMS-GEM 1+2 : 1m  (to be checked)
      EP-DT1 : 1.5 m   (to be turned OFF soon)
      ATLAS-RPC : 2.5 m  (test for 1-2h, then we will be off)
                             + second trolley near downstream wall  (already OFF)                    
      CMS-CSC 1 : 2.5 m  (Ready for Christmas)
      CMS-CSC 3 + LHCb : 5 m (Ready for Christmas)
      CMS-DT :  finishing dose measurement today. Followed by usual Thursday scan.  Then Scan with dosimeter.

       

      Gas Supply : Change to Christmas flushing conditions this afternoon.
      We will try to put a logbook entry.

      Source will be interlocked tomorrow around lunchtime.

    • 2
      Restart of Facility - January 2019

      Monday : Afternoon restart of normal gas supply.

      Tuesday : Remove interlock of Irradiator  - Tuesday morning, followed by short access.

      Wednesday : Normal Access day

      Thursday : First meeting of the year in new room / same floor.

       

       

      ATLAS-MM : plan to be back with 2 chambers on 30.01

      ATLAS-sTGC : 3 chambers back on 16.01 behind ALICE.
                                installed chamber will be equipped with electronics.

    • 3
      Infrastructure & Upgrades to the Facility

      Improvements needed or planned for the facility.

      Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)

      New Items :
      ==========

      New transformer substation test BE2.  In the morning, lasting 1h. - Ongoing
      Small, but non zero risk (1-2%) of a complete power-cut of max 2 minutes (operator on site).
      https://impact.cern.ch/impact/secure/?place=editActivity:123425

      Update / Restart of the BE/CO infrastructure. 21-23.01

       

      Ongoing Projects :

      NEW retrieval of TIMBER values : Work in progress, but already available in beta version
      https://epdtdi-pytimber.web.cern.ch/app/gifpp (also linked from main GIF page.

      Additional values need to be collected/republished ?
              - REMUS  - to be included in GIF Display
              - XTDV - to be included in pytimber only

      • a) Requirements during LS2 + Christmas

        CMS-DT : Ar/CO2        70 l/h
        CMS-CSC : AR/CO2     10 l/h
        EP-DT : will let us know

        We potentially need a piquet from the user side. Access to be requested via TC.

         

        Proposal : Stop of gas (except flushing) on Thursday 20.12 afternoon. -> User operation stopped before lunch time.
                         Restart of gas supply : Monday 7.01 -> User operation starting Tuesday

    • 4
      Announcements

      You can subscribe to the calendar with the following link (to be added in you calendar application)
      http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics

      • a) IMPACTS for 2019

        Guidelines for filling in IMPACT requests

        General Guideline : One IMPACT per setup.

        • two chambers on individual supports -> 2 IMPACT declarations
        • multiple chambers swapped on same or similar support -> one IMPACT declaration
        • basically, if you need two locations, please make two IMPACT declaration (clone)

        Each Setup should have IMPACT label attached with number.
        Attached documents : CAD file  or  picture.
        Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).

        NEW IMPACT needed for 2018. (All current IMPACTS will expire at Saturday 23.December)

        Special IMPACT needed for Christmas Closure.

      • b) New Announcements
      • c) AOB

        AIDA Transnational Access - Still fund available. Please provide  feedback by tonight to M. Moll.

        Next weeks meeting : different room !   (864-1-B04)