Present: GP, Fanouria, Chiara, Alan, Simon, JF, Piotr, Michele
Open Actions
Possible having two more tune BPMs? There are two phase BPMs which have to be removed but the space is not enough. This requires new design, integration etc. etc. and there is no time to do this in LS2. For optics measurements Piotr should check with Marek and colleagues that what he needs is available and working after LS2.
Main highlights from Evian workshop (GP):
Improved performance of injectors over the years
Standard 25 ns beam used for scrubbing
2.3e11 now intensity for BCMS beams as well in the LHC (1.7 um emittance)
8b4e still on the table due to e-cloud and cryogenic capacity limitations ==> not clear change foreseen for HL-LHC so we may need for mixed filling schemes (BCMS + 8b4e). Alan remarked that this could require blocking a few timing users to be ready for the LHC filling.
Intensity ramp-up with constant emittance (1.3 um) up to 1.8 ppb. The increase to 2.3e11 over the years and to be reached in 2024, when LHC is already in LS3.
The LHC dump also limits operation to 1.8e11 until LS3 (lower limit ±1.1-1.2 e11 before first YETS when upstream window will be upgraded)
Operation at 7TeV requires a lot of training and this might introduce a couple of months delay. A decision may come at the beginning of March 2019.
LHCINDIV production (Simon):
A longer transition time is better for the bucket area otherwise one risks losing beam in an uncontrolled way.
A shorter time allows starting shaving earlier but the beam quality and bucket area might be deteriorated.
Aim: define the minimum number of turns needed to produce INDIV beam. It is not possible to get 12e10 in 0.3 eVs in 1 turn no matter what the voltage is.
Two turns is just possible but at the limit, three turns is fine.
In general one should aim for a slightly higher intensity (15E10), which is preferable for flexibility and reproducibility
Shaving done in simulation with H=8. Alan and Simon will check the pre-LS2 LHCINDIV production to check if it was done with h=16 or higher. Alan and Simon confirmed afterwards that it was h=16.
Simon is also investigating injecting at flat bottom for the optics measurements (requested by Piotr). This will not be an operational LHCINDIV, but a beam type to be used for the optics. Only the intensity is relevant. Bunch length and emittance will be only relevant for the TbT setup, i.e. to make sure that the system will work under this conditions.
Turn-by-Turn BPMs (Michele)
16 BPMs delivering signal for radial loop will get a local buffer to solve the issue with the noise. Alan and Michele said the solution was successfully tested end of 2018 and it should be the final solution to this recurrent issue. GP asked if any test could be done without beam to see that indeed the solution works everywhere. Action Michele: check if possible testing without beam.
Synchronous timing (per ring and distributed) needed for the first measurement. Action Michele: clarify timing request with CO and RF.
BTM resolution should be better than 100 um (dependency on bunch length and shape). It should be ready on time but need to ensure enough time for setup taking into account possible issues. The bunch length/shape will be defined by Simon's simulation. Piotr also reminded about the problem of ringing with low intensity and high gain. Michele will follow this up with Jeroen.
Piotr’s request: visualise and also adjust the gating for beams possible? In case it is not desirable for operations, could it be done for MDs only? Michele replied that currently this is considered an expert setting. We need to define an appropriate strategy which does not block operation (Fanouria mentioned that a wrong gating problem was encountered a few times also in operation) and is compatible with BE-BI.
The visualisation is possible, but it is not clear about the adjustment. so far it seems only an expert setting. To be discussed in the context of the preparation of the PS and PSB orbit application.
Proposed topic for the next meeting: plans for H0/H- monitor calibration and matching monitor setup (Federico)
There are minutes attached to this event.
Show them.