Present: Fanouria, Bettina, Alan, Piotr, Simon, Chiara
LHCINDIV (Simon): found some inconsistencies between calculations and tracking simulations, the problem is being investigated with the support of the “longitudinal beam dynamics” WG. More news at the next meeting.
No changes in EDMS document and Actions status
Procedures have to be written in preparation of the PSB commissioning and operation. The aim is to specify all the needed steps for a defined measurement, beam conditions, machine settings, interlocks to be masked, etc. An excel table is available (
https://cernbox.cern.ch/index.php/s/PlUowqNRXSiTH69#office) and should be filled with the list of procedures which have to be written, name, dates etc.
Simulations: collaboration started between ABP and ABT to integrate the injection process in the standard pyORBIT environment. IT will take some time to have everything correctly integrated (aperture model, waveforms etc) but it will allow to be more efficient in the long term. First results (mainly ISOLDE beams wo longitudinal painting) might be available, at the earliest, in one month.
Optics measurements (Piotr):
- At the next meeting report on beam excitation for optics measurements: clarify what will be needed and if available after LS2 (possibly also contribution from Marek and/or Gerd)
- K-modulation: need to vary current of quads at each side of the wire scanners. The current has to be modified such to be able to vary the tune by 0.1 (more details at next meeting)
- Tune kicker: functional specifications where the actual need of the tune kicker is justified ==> same HW (BI responsibility) for first year(s) after LS2 and then, if approved, completely new system (ABT responsibility)
Next Meeting: 26th March 2019