PSB Commissioning Meeting #14 (Optics, LHCINDIV)
Participants: Alan, Fanouria, Piotr, Simon, GP and G. Kotzian, M. Gasior, T. Levens, D. Cotte, F. Tecker
Status of the documentation:
- Writing is advancing slowly
- Alan has prepared the RF commissioning in more details. He will present it in about a month time scale
- GP has completed the section concerning the TFB commissioning. Gerd will have to double check it (open action)
- GP has added a block for the B-Train, based on the information provided by A. Beaumont. In the near future Anthony and colleagues should come to present the steps of the commissioning, so that we can discuss the details (open action).
Status of simulation:
- Simon reported that he is working on the LHCINDIV. He was trying some more complex algorithm to sort out a good voltage program, and in the end it yields similar performance to the simplified approach.
- Fanouria reported that the space-charge WG has cleaned-up the PSB code and now Tirsi is starting the simulation for ABP and the work is progressing well. Fanouria also said that ABT is currently working on the simulation with Chiara and Elisabeth (Renner) implementing the previous work done with PTC-Orbit in pyOrbit.
Beta-beating correction and optics measurements:
- Piotr presented a details set of needs for the measurements and proposal for improvements
- Could we use the tune pick-up in 3L1 for turn-by-turn measurements?
* The error bar on the BPMs at 160 MeV would drop to 0.5% (was 20%) and at the WS by 5% (was 50%)!
* Marek said that in the current configuration the tune BPM in 3L1 cannot be used for optics phase measurements
* The signal cannot be split, otherwise it will affect the performance of the tune measurement considerably. Special electronics with a mechanical switch to configure the tune BPM as TbT or for the tune measurement could be installed. Tom added that about 13 cables (3 cables per ring + 1 calibration) should be installed.
* Before going any further Marek suggested that Piotr discusses with Jeroen to see if:
- there are spare channels in the TbT system (if no spare channels there is not much that we can do anyway),
- the signal from the tune BPM would be compatible with the TbT system. How can the TbT deal with the tune BPM signal?
- Could we use the phase pick-up in 11L2 for the new vertical WS?
* No, because the pick-up is just a single ring electrode.
- Could we use the TFB pick-up in 4L5 for the new horizontal WS?
* Gerd said that in principle it should be possible. Turn-by-turn OASIS signal is available. One should be careful about the synchronisation. The option will be explored during the commissioning time.
- K modulation:
* Piotr made the calculations. Now he needs to contact A. Newborough and S. Pittet to see what would be needed (open action)
- Necessary tool for optics measurements:
* Marek and Tom said that ideally the new electronics should allow generating signal internally and controllable remotely. So one does not need anymore an external waveform generator. The idea is to rebuild the FESA class. BE-BI committed to have a first prototype ready by the end of the year. Then Piotr could start his development. He needs to control the phase and the amplitude modulation. In case of issues with the FESA class a generator will be provided, controllable manually. So at least the same performance as of today.
* Concerning the ADT in the TFB, Tom said that the excitation was tested last year with both the old and new TFB and worked just fine. Gerd said that the plan is to start with the old amplifier post-LS2 and the TFB is able to generate a signal for the excitation, so this could be of use for the optics measurement. A mock-up for Piotr to start testing his script should be available in 1 month time scale.
* All the preliminary HW tests should be part of the HW commissioning.
A discussion followed on the possible location to install additional BPMs:
- 11L1: not possible b/c the wire scanner are installed staggered. Two on the left and two on the right of the multipole stack
- close to BHZ152: not possible b/c the KSW16L1 goes in that location
- In section 6L1: could be possible because this was the location for the Finemet installation for testing the prototype, but it is also the area of the passage? Any problem.
- In the octopule stacks: Could be.
Tom said that ideally the HW is there as one could re-install the old tune BPM stack. On the other hand, the electronics is to be rebuilt. And cables pulled. GP said that, given the tight constraints in LS2 and the massive workload for all groups, we should probably investigate this option in future technical stops, but now it is too late to schedule an intervention, not to mention to find the budget.
Next meeting will focus on the calibration and needs of the H0/H- monitor by F. Roncarolo.