PSB Commissioning Meeting #15 (H0/H- calibration)

→ Europe/Zurich
774/1-014 (CERN)

774/1-014

CERN

12
Show room on map
April 9th 2019
 
Participant: GP, Bettina, Fanouria, Michele, Piotr, Jean-Francois, Alain, Simon, Chiara, Federico
 
Action on optics closed.
K-modulation: discussion at one of next meetings
Splitting electronic of tune pickups and see if compatible with turn-by-turn measurements: it looks like it is possible but need to discuss with G/Jerome for final answer and needs.
Gerd: transverse feedback commissioning
New FESA class for tune measurements electronics to be checked by Gerd. Need to think who will develop the application for OP.
In a month the mockup for the new digital transverse feedback will be ready and available for tests.
 
Alain edited the commissioning document which is now 20 pages. It is time for clean up! Editing online is not the most convenient way so GP will investigate a better solution for sharing the document.
 
LHCINDIV: redesigned voltage program and added intensity effect in simulations for 3 turns injection (2 turns might be possible but more complicated). Simon will show the results at the next meeting. 
 
H0/H- beam current monitor calibration - Federico
 
Four plates in front of the dump, the stripped electrons will give a current signal on the plates. There will be also emission of secondary electrons and back-scattered electrons but the magnetic fields of the BSW will suppress these electrons, so no need to suppress this signal.
Four monitors are ready for installation and four are already installed in BSW4
10 electronic cards were produced and tested in the lab
Functionality: online-Monitoring (FESA and OASIS), interlock and stripping foil stripping efficiency measurements  
Due to very different operational current, the monitor can work in either high or low gain mode ==> need to define the limit of saturation for the high gain mode. Action: clarify if it is peak or average current. 
BIS monitors the sum of all four plates and reacts on integrated signal. It has to either discharge or be cleared after 1.2 s (Federico will check that it is the case)
SIS (per user) is monitoring each single plate, a calibration factor has to be provided for each plate 
HST: calibration was done by steering a pencil beam, with different currents, without stripping foil towards the different plates. The upstream BCT was used and the assumption that no loss occurred between the BCT and the monitor was made. A calibration factor with a variation <2% was measured.
When repeating the measurements with the stripping foil, the H0/H-monitor showed a higher striping efficiency than the relative measurements between BCTs because of losses due to a non-perfect steering with the BSW between the two current monitors.
Commissioning proposal:
  • Need to ensure HW and SW readiness to check timing signals and BIS. During the HW commissioning it is requested to be able to access tunnel to test the signals (Abdel should be put in contact with Michele)
  • Need to define milestones for OP applications (specialist application was already done)
  • Three commissioning steps:
    • Steering the beam on different plates ==> center the beam  with respect to the foil (using steerers and BSW 3 and 4).
    • Parasitic checks during commissioning of other systems 
    • Repeat measurements with different intensity. Need to have from EN-STI the beam current limits for the dump.
    • First calibration with no foil
    • Calibration with stripping foil IN. Comparison with BCTs in the line and the ring.
    • Absolute calibration and interlocks without foil and different intensity. Probably better to anticipate this part since all tests without stripping foil should be done at the beginning while masking the SF BIS signal. Once this is unmasked we should not get back to measurements without foil. Again maximum allowed currents without foil have to be confirmed by EN-STI. Important to understand if what matters for calibration is only pulse length or also the current
The information about electronic cards should be put in an accessible DB.
Need to define all data which have to be stored in the logging DB