PSB Commissioning Meeting #16 (Tune Kicker)

→ Europe/Zurich
774/1-014 (CERN)

774/1-014

CERN

12
Show room on map

Participants: S. Albright, F. Antoniou, M. Bozzolan, J.F. Comblin, G.P. Di Giovanni, A. Ferrero Colomo, A. Findlay, T. Kramer, B. Mikulec, F. Roncarolo, P. Skowronski

 

Context for the meeting: BE-BI expressed the desire to hand over the responsibility of the PSB tune kicker to TE-ABT. Before accepting, TE-ABT has been investigating the current system and current possibilities for an upgrade. The meeting is held to further discuss the needs of TE-ABT in order to formulate a realistic plan.

 

A. Ferrero Colomo presented the investigation done by ABT on the PSB tune kicker, slides available here

  • Present system specifications are available in slide 3.
  • Present system is an old technology and its control would need a redesign at least for the pulse generator operation in order to be accepted under TE-ABT responsibility.
    • TE-ABT does not have resources available to support the current system as it is.
    • The working group would like to keep at least the current system working as it is during Run3.
    • Action: M. Bozzolan to check with BE-BI experts (M. Gasior, T. Levens) if the current tune kicker system could be still maintained during Run3 operation, i.e. until LS3.
  • Before considering options for a modification/upgrade, TE-ABT requested functional specifications to be written.
    • Any upgrade should in fact include a new control interface and a refurbishment of the pulse generator.
    • On the positive side, this could be the opportunity to prototype new technologies, e.g. the ones under development for FCC.
    • Action for the PSB BCWG: Prepare functional specifications for the tune kicker post-LS2.
    • Based on the functional specs, a feasibility assessment with basic budget assumptions could be provided, for a minimum and for an upgrade scenario.
    • If the requirements are feasible and the resources are found, TE-ABT could take over the responsibility.

 

P. Skowronski presented a detailed report on the studies and requirements for the PSB tune kicker to perform optics measurements, slides here.

  • The requirement of flatness and rise/fall time seems to be within the reach of the current tune kicker.
  • PPM operation is necessary.
  • The expected repetition rate is:
    • Tune measurements: every few ms at low amplitude (as of today).
    • Optics measurements: high amplitude (as high as possible) and one could afford waiting for a few minutes of cool down of the hardware if needed be.
  • Amplitude:
    • The maximum kick which could be used in 2018 was 2 kV at 160 MeV and allowed to obtain an amplitude of 0.6 mm (after a few additional corrections like chroma, etc).
    • Based on simulation, one would need a 20 mm kick in order to measure sextupolar resonance driving terms with 5% resolution, i.e. ~35 times more than now.
    • In any case, an increase of a factor 10 in amplitude would already result in an improvement of a factor 10 in resolution for the phase measurement (at 160 MeV) crucial for the optics measurements at the new PSB injection energy.
    • The situation would be even more challenging at extraction energy.
  • The information presented in the slides are going to be used to compile the functional specifications.