PSB Commissioning Meeting #17 (Transverse Painting)

→ Europe/Zurich
774/1-014 (CERN)

774/1-014

CERN

12
Show room on map
Participants: GP, Fanouria, Bettina, Frank, Alan, JF, Piotr, Chiara, Simon, Federico, Michele
 
News:
  • MPP workshop outcome: core group of people from MPP and OP to discuss about possible machine protection concerns also on LHC injectors other than SPS (procedure, settings management, etc.). The group will start with Linac4 and then progressively discuss all other injectors.
Actions:
  • Tune kicker. New action added to the list. Functional specifications will be written by ABP and OP.
  • Mockup of transverse feedback for tests should be ready in one month.
 
Chiara presented slides concerning the commissioning of the PSB Transverse painting, slides here.
  • Reduce minimum current when operating with no-foil.
    • H0/H- dump limits should be checked.
    • H0/H- calibration mainly needed for setting the thresholds for the interlock. We could do the calibration while steering the beam (need to know beam intensity upstream and assume no losses. Need a pencil beam which fully fits in each plate.
    • Optics with alpha 0 (possible checking just varying one quad) and calculate beam size at monitor 
    • Minimise injection oscillations (BPMs). KSW in YASP? Chiara explained that no machine (not even LHC) has the kickers in the model for steering. Moreover the KSW have to be used for painting so the control should be disentangled from the steering.
    • One of the main difficulty is that we lack a measurement equipment when the bump is at its maximum height.
      • Need to prepare a “makerule" to correlate tune and reference KSW amplitude.
    • Ideally keep BSW and KSW nominal and vary correctors and steerers to minimise injection oscillations
      • Do we have magnetic measurements of BSW?

Frank presented slides concerning the commissioning of the PSB Transverse painting, slides here.

  • One could consider the option to use the WS as a mismatch monitor at injection, by analysis the oscillation of the measurement itself induced by the beam size beating.
    • Federico commented that as the WS is a multi-turn device, it will catch all the effects during the ramp down of the BSW, etc, etc, so it will be extremely challenging to use it to resolve similar effects.

General:

  • Need to insure that kicker can be pulsed to extract the beam at 160 MeV not to burn the grids.
  • Several options were discussed with different degrees of complexity. We all agreed on trying to simplify the process, so the plan is to review and finalise it in a future meeting.
 
 

 

 

 

 
 