User Reports / Overview :
----------------------------------
ATLAS - sTGC : 2 QS1 received at GIF, one tested and out. Second one will go in soon.
1 QS3 out.
ATLAS-MM : LM2-M5, SM1-M10 in, will stay for another day. Access requested 1h tomorrow to change for.
SM1-M11, SM2-M8.
GC usage requested for the next week.
EP-DT1: Oxygen (peak suspected), but not confirmed.
EP-DT2 : Test on the stability of gas systems.
EcoGas : Some issues, to be understood.
CMS-RPC : Trolley for testing the electronics is installed. Cosmics with background.
22-4.6 filter range with 10h scans. as much as possible.
1 week program. 46-4.6 for 6h each. (maybe a few hours 2.2)
For the other trolleys 2.2 requested.
GC requested for the end of next week.
Gas flow needs to be checked, as we are on the limit.
CMS-GEM 1&2 : GEM 2 gas flow seems to be ok now. GEM 1: OFF
ATLAS-RPC : BIS removed. Another trolley BIS still to arrive.
No request for the R&D setup.
LHCb : Fine.
CMS-CSC: Currently not irradiating. Question of Oxygen in chamber.
Plan to irradiate the next 2 weeks.
==========================================================
Weekly Planning : https://teamup.com/ksvh7dak8mub8k7xpe
UPSTREAM : Default filter settings : 2.2
DOWNSTREAM : Default filter settings : 1
-------------------------------------------------------------------------------------------------------
Irradiator Maintenance : Week 29
---------------------------------------------------------
Gas usage at GIF : we need to compile a table of gas mixture / consumption
Gas training courses : ATEX level 1 and F-Gas training courses.
List of trained people to be collected.
https://lms.cern.ch/ekp/servlet/UNIVERSALSEARCH?ACTION=SEARCH&KEYW=atex
---------------------------------------------------------
Next Annual User Meeting : Proposed day TUESDAY 10.09.2019
Please let us know if there are particular bad days (ATLAS/CMS weeks etc)
Improvements needed or planned for the facility.
New Items :
==========
Cleaning of DCS and installation of UPS : to be scheduled.
Ongoing Projects :
=============
Correction of Irradiator Signals after power cut.
Since installation of UPS, the Irradiator signals UNSAFE after a power cut, independently if the source was ON or OFF at the time. In reality, source will always be in safe position after power cut. Power cycle controls in control room to get correct status.
PyTIMBER :
Additional values need to be collected/republished ?
- REMUS - to be included in GIF Display
- XTDV - to be included in pytimber only
News about the ongoing bunker extension
You can subscribe to the calendar with the following link (to be added in you calendar application)
http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics
Guidelines for filling in IMPACT requests
List of active IMPACT declarations : https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154
General Guideline : One IMPACT per setup.
Each Setup should have IMPACT label attached with number.
Attached documents : CAD file or picture.
Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).
NEW IMPACT needed for 2019 !