Phase 2B of the HIE-ISOLDE project was completed in July 2018 after the last of four high-beta cryomodules was installed and commissioned. Phase 3 of the project called for the replacement of four of the REX normal conducting structures by two low-beta cryomodules. However, this phase of the project has not been approved and it is on hold for the moment. In this contribution, initial...
Go to contribution page -
Joakim Cederkall (Lund University (SE))04/12/2019, 11:35Invited
In this presentation a summary will be presented of typical beam characteristics needed for experiments using spectrometers and mass separators for reaction studies at HIE-ISOLDE. Focus will be on time-of-flight spectrometers with an introduction to the techniques currently used, and the requirements these methods put on temporal beam structure and energy spread. Some physics cases will also...
Go to contribution page -