Status of documentation:
* Piotr updated the chapter on the "optics meas. & corr."
* Max Dp/p to be measured during LBE run?
Paper on pre-LS2 beam production
Re-check list of variables in Verena's presentation at the last LIU-CCC just to make sure about the content (slide 3 of https://indico.cern.ch/event/841490/contributions/3530531/attachments/1896446/3128954/PerformanceTracking_LIUCCC_Aug2019.pdf)
Previous list available at