GAS M&O meeting 07 October 2019

Present: Beatrice, Roberto, Michal, Kacper, Andrea, Fred, Patrick, LPh, Sabino, Federico, Mara, Gianluca

Indico: https://indico.cern.ch/event/852947/

 

ALICE #no elog

  • MTR
    • exhaust pressure regulation does not work
    • mixer pressure regulation does not work: Zimmerli not installed

Reminder:

    • Dummy chamber: Arturo said he has no manpower to install the pipes
  • TPC
    • Rack pump re-building done: to do leak test (since last week)
    • 7th —> 14th October: final connection for TPC for the gas system
    • Modification to add the filter in the distribution pipe

Reminder:

    • LPh to prepare a summary on how the system is now —> in 2 weeks
  • TRD
    • Regulation valve in pump module was oscillating a lot: Michal fixed he problem by changing the PID (elog 1983)
    • In general: not waiting too much time before saying in case of oscillation problem of the valve

Reminder

    • Purifier: to review if keep the safety valve or the rupture disk
    • Purifier: safety valve at the input where we have Ar or Ar/H2 at high pressure —> LPh to check with safety

 

ATLAS #1984

  • General power-cut
  • CSC
    • After the power-cut there was not communication with PLC: damage of differential circuit breaker —> to repair
  • RPC
    • MFC of R134a repaired last week and installed
  • MDT
    • New P&ID for the pump module: two pumps
    • It is a turbo pump so we need the pneumatic valve normally open
    • Addition of filter in front of the pump to avoid any dust going inside the pump
    • Need to stop the gas system for two weeks to do the modification

Reminder:

    • Rack 68 (ch 17): one channel is keeping going to zero —> try to change the ELMB

 

CMS #1981

  • General power-cut
    • We loose the pressure in the FESTO module regulator every time the system stops: there is a default int he module —> Patrick/Fred/Andrea to check
  • RPC
    • OFF
    • Modification of purifier filters finished (see picture in the elog)
    • Pneumatic pipes on going (50% done), to finished in week 42

Reminder:

    • Rack 85: problem of pressure sensors in error —> Michal/Patrick to check
  • CSC
    • Stop analysis rack of CSC to check if the spikes of regulation valves are coming from the this —> Andrea

Reminder:

    • Problem on distribution: strange peaks in the regulation valve and some alarms due to low pressure in the rack —> to investigate
    • To check and correct level of oil in bubblers of distribution
    • Warning to set-up —> Beatrice/Michal/Roberto
  • GEM
    • To modify the réseaux socket for the GEMPLC (now it is with TOTEM) —> Patrick/Michal
    • Control rack: to modify power supply and electrical cable (still with TOTEM) —> Patrick/Michal
    • 1 chamber in purge in CO2
    • Try to run the system but system was not stable: pump in negative pressure (-60 mbar)
  • R134a recuperation
    • Add line of Air for the R134a recuperation
  • General
    • Open/close plugs during open days and last Monday: 2 mbar more in the cavern caused a stop of CSC distribution racks

 

LHCb #1982

  • RICH1
    • in Run with CO2
  • RICH2
    • Regeneration of purifier done last week
    • Membrane 2 is still old one and it is not efficient —> we will not use
    • Then we will need to move to Air: waiting for the compressor. But then it will be the detector people to put Air inside
  • SciFi
    • To connect pipes for the racks of distribution and mixer
    • Chassis: still 2 weeks of work
    • To finish the system by October
  • GC
    • PC is working but not the GC —> Mara to contact the company

Reminder:

  • MWPC in run with Ar/CO2
    • Rack 64 —> to investigate

 

PIQUET

  • elog 860
    • Heating of purifier not working but it was off because it was not commissioned yet
  • elog 862
    • Pump alarm because the pressure in the loop was too high (1.7 bar). After several investigations , it looks like it is the analysis module (exhaust and pump valves in the analysis module) —> LPh to investigate
  • ALICE TPC: somebody closed the back-up of CO2 —> LPh to check

 

GENERAL

  • Student (sesec) show the status of electrical drawings
    • Pump module almost ready
    • ELMB2: new firmware will be prepared by a guy
  • Commissioning of software: if not finished
    • Put in force mode in WinCC-OA
    • Add an entry in the elog
    • Send an email to gas piquet
  • New manifolds
    • Still wrong: Andrea discussed with the main workshop
    • Company wants to do a prototype to check if they will do correctly: 1 week
  • Regulation valve
    • The one with PWL

 

PLC/Software

There are minutes attached to this event. Show them.
    • 09:00 09:05
      Piquet interventions 5m

      http://eloggas.cern.ch/GAS_PIQUET/

      Speakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Frederic Merlet (CERN), Louis-Philippe De Menezes (CERN), Patrick Carrie (CERN), Kacper Jerzy Kapusniak (CERN), Michal Zbigniew Zimny (CERN)
    • 09:05 09:10
      Activities on-going 5m
      Speakers: Beatrice Mandelli (CERN), Frederic Merlet (CERN)
    • 09:10 09:30
      Plan of LS2 activities 20m
      Speakers: Beatrice Mandelli (CERN), Frederic Merlet (CERN), Roberto Guida (CERN)
    • 09:30 10:55
      Gas systems for the LHC experiments
      • 09:45
        ALICE 5m
        Speaker: Louis-Philippe De Menezes (CERN)
      • 09:50
        ATLAS 5m
        Speaker: Kacper Jerzy Kapusniak (CERN)
      • 09:55
        CMS 5m
        Speaker: Andrea D'Auria (CERN)
      • 10:00
        LHCb 5m
        Speaker: Patrick Carrie (CERN)
      • 10:05
        Gas analysis: standard H2O/O2 5m
        Speaker: Louis-Philippe De Menezes (CERN)
      • 10:10
        Gas web-page 5m

        http://test-gasmonitoring.web.cern.ch
        https://ep-dt-gasanalysis.web.cern.ch

        Speaker: Beatrice Mandelli (CERN)
      • 10:15
        Software 10m
        Speaker: Michal Zbigniew Zimny (CERN)

        in the attachment presentation prepared by Grzesiek about electrical schematic status and ELMB2 tests

    • 10:55 11:35
      Gas System developments
      Conveners: Fabio Bordon (CERN), Sabino Zagaria (Universita & INFN Pisa (IT))
      • 10:55
        Gas System Test-Bench 10m
        Speakers: Fabio Bordon (CERN), Sabino Zagaria (Universita & INFN Pisa (IT))
      • 11:05
        CMS CF4 recovery 10m
        Speakers: Fabio Bordon (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
      • 11:15
        LHCb RICH2 CF4 recuperation 10m
        Speakers: Federico Consolaro (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
      • 11:25
        AoB 10m
        Speakers: Fabio Bordon (CERN), Federico Consolaro (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Mara Corbetta (Universite Claude Bernard Lyon I (FR)), Sabino Zagaria (Universita & INFN Pisa (IT))
    • 11:35 11:45
      FSU & Jobs status 10m
      Speaker: Frederic Merlet (CERN)
    • 11:45 11:55
      AoB 10m
      Speakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Frederic Merlet (CERN), Louis-Philippe De Menezes (CERN), Patrick Carrie (CERN), Roberto Guida (CERN)