CLIC Beam Physics Meeting

→ Europe/Zurich
6/2-004 (CERN)

6/2-004

CERN

40
Show room on map
Description
Vacuum requirements in the main linac
Participants: R. Appleby, B. Dalena, J. Esberg, L. Gatignon, B. Jeanneret, M. Jonker, E. Marin, Ö. Mete, R. Mutzner, Y. Papaphilippou, J. Pfingstner, L. Rinolfi, G. Rumolo, D. Schulte, J. Snuverink, G. Sterbini, F. Stulle, R. Tomas D.S. reported on the last CSC meeting. Main topic was the collaboration of ILC and CLIC. The joined ILC-CLIC workshop will take place in October. An Indico page will be set up soon. G.R. discussed newest developments in simulating field ionization by the main beam in the main linac. The model has been improved and results point to vacuum requirements of some nTorr to avoid beam instabilities.
There are minutes attached to this event. Show them.
    • 16:00 → 16:45
      Vacuum requirements in the main linac 45m
      Speaker: Giovanni Rumolo (CERN)
      Slides