Speaker
Robin Lauckner
(AB/CO)
Description
The sector test will provide an interesting milestone for the LHC
control system. An overview of the infrastructure and technical systems, including
the beam interlocks, that have to be in place for the test is given. The
requirements on the high level software are detailed. Planning for the delivery of
this software is outlined.Pre-testing of the control facilities will be vital and
an outline of the test procedures and their scheduling are given.
Author
Robin Lauckner
(AB/CO)