Speaker
Roberto Saban
(CERN)
Description
The preparation for the injection tests of the equipment described in the two
previous presentations will be given in detail. The level of the commissioning of the
equipment will depend on the time available between the cool down and the end of the
injection test: this level can vary from the complete commissioning up to nominal
current of all the circuits to the minimum current required for the injection test
only for a limited number of circuits. The implications (organization of the work,
coactivities with other sectors, etc.) of these scenarios will be described.
Primary author
Roberto Saban
(CERN)