Speaker
Alexander Koschik
(AB/ABP)
Description
The motivation for quenching magnets during the sector test is revisited and
presently assumed quench limits recalled. Which magnet (s) are planned to be used and
the associated BLM layout and local aperture layout are detailed.
The required beam intensity/emittance/angle to reach the quench limit in the coil is
estimated and how this is to be achieved by steering beam into aperture.
The current knowledge from simulations is reviewed. Requirements from further
simulations, extra instruments, controls, applications and logging are briefly
enumerated.
Author
Alexander Koschik
(AB/ABP)