Speaker
Lars Jensen
(AB/BDI)
Description
The state of installation and preparedness of the large distributed system - BLMs
and BPMs - is covered. The required controls infrastructure is described along with
the proposed series of tests that will be performed to confirm readiness before the
test it self. Other discrete instrumentation - BCT and BTV - are detailed and again
plans for installation and testing are presented. The need and plans for other
systems, BST for example, is also mentioned.
The proposed acquisition modes during the test are described along with desired
measurements to assess instrumentation performance.
Author
Lars Jensen
(AB/BDI)