Elena Manola-Poggioli
(TS/CSE),
Patrick Lienard
(AT/MAS)
25/01/2006, 15:15
The SPS access system is not conforming to the requirements of a modern INB
installation and an upgrade program has been launched to remedy this situation.
This program is split into three phases that will be implemented, in the present
planning, in the shutdowns 2006, 2007 and after the first physics run of the LHC
respectively. The presentation will briefely touch on the three phases...
Germana Riddone
(AT/ACR)
25/01/2006, 16:10
The cryogenic distribution line (QRL) is divided in eight sectors, and each of them
(about 3.2 km) is a continuous cryostat starting at the cryogenic interconnection
box and ending at the return module. Each sector is sectorised in 9 vacuum
subsectors, to easy installation and commissioning, and is composed of about 300
straight elements and 40 so-called service modules feeding the...
Vincent Vuillemin
(TS/MME)
25/01/2006, 16:35
The status and prospectives of two workpackages realised in TS-MME will be
presented: beam instrumentation and collimators. Concerning the monitors dedicated
to the beam instrumentation, the availability of the various designs and
constructions will be outlined, as well as the challenges and the critical issues
related to their on-time installation. For the collimators, the advancement...
Stephan Russenschuck
(AT/MEL)
25/01/2006, 17:00
The presentation will discuss electrical quality assurance (ELQA) in the tunnel,
and the first results from partial assembly qualifications (PAQ) and arc
interconnection verification (AIV). Two major issue now confronting us are the
management of ELQA on 7-8 fronts simultaneously and the polarity nonconformities in
magnets and magnet sub-assemblies. Finally the polarity convention...