Gas systems project

Europe/Zurich
155/R-047 (CERN)

155/R-047

CERN

10
Show room on map
Beatrice Mandelli (CERN), Frederic Merlet (CERN)

GAS M&O meeting 20 January 2020

Present: Beatrice, Roberto, Fred, Patrick, Kacper, Andrea, Michal, Mara, Federico, Fabio, Sabino

Indico: https://indico.cern.ch/event/879657/

 

ALICE #2189

  • MTR
    • Alarm in power supply: DC MCB trip —> Michal/Patrick to check
    • Start with standard gas mixture on Thursday and to add water to humidifier
    • No access full week 4

Reminder:

    • exhaust pressure regulation does not work
    • mixer pressure regulation does not work: Zimmerli not installed
  • CPV
    • Probably water in pipes —> try to flush with N2

Reminder:

    • Start to reconnect the detectors but in one channel there is overpressure, probably coming from the pipe: LPh is investigating
  • TPC
    • Still leak present, system is running in Ar
    • Problem of deltaP in TPC for the purifier due to metal frité —> LPh to solve
  • TRD
    • Fred stop the second column

Reminder

    • Purifier: to review if keep the safety valve or the rupture disk
    • Purifier: safety valve at the input where we have Ar or Ar/H2 at high pressure —> LPh to check with safety
    • Alarm on power supply

 

ATLAS #2192

  • CSC

Reminder:

    • After the power-cut there was not communication with PLC: damage of differential circuit breaker —> to repair
  • MDT
    • To discuss procedure for pump changed
    • On-going work for pump
    • Safety valves under calibration
    • Add a second H2O sensor for the exhaust and use this one to regulate
    • For MDT a big PLC is needed: Michal ordered

Reminder:

    • In general: several problems with pressure sensor in MDT. Patrick said to add a resistance in the channel
  • General
    • Power of bande chauffant —> Patrick/Kacper

 

CMS #2185

  • RPC
    • barrel now in nominal flow
    • dummy chambers ready —> RPC people to install
    • iC4H10 MFC doesn’t work correctly —> to try to change to the second line
    • in 5 days we manage to have good gas mixture under gas recirculation with a flow in the mixer of 600 l/h
    • RE-3 #67 reading of flowcell is 50 l/h (but we are sending 200-300 l/h and the input pressure correspond to the one we had before) while RE-4 #68 is reading 260 l/h: Michal checked mapping, motherboard, calibration file and ELMBs and they are fine —> to investigate: Andrea to check flow with drycal
    • Federico to put in the elog the summary file of the pressure sensors of RPC
    • Fabio to put an elog of leak test with sniffer: at least 3 points with high leak rate
    • Reminder:
    • Missing quick manifold and flowcell in barrel +1 and +2
    • Swap of pipes in rack RE-1 (racks 61 and 65) and RPC 3.1 (racks 63 and 87)
    • Rack 85: to check if dummy chamber is installed, if yes to add pressure sensor connection
  • DT

Reminder:

    • Difficult to re-start the gas system after power-cut —> to do some tests
    • Test for power cut and re-start for the exhaust line —> to do other tests
  • CSC

Reminder:

    • Warning to set-up —> Beatrice/Michal/Roberto
  • GEM

Reminder:

    • Flowcells problem in rack 61: ch 3, 5, 7, probably a leak in the connectors of the patch panel of GEM —> Mara to check with Daniel
  • R134a recuperation
    • To start this week

 

LHCb #2190

  • RICH1
    • last week: 1.5% of Air
    • stopped because the pressure in the loop was too high —> to do GC analysis
    • to change the MFC of CO2 in order to be able to check the CO2 injection: we have 30 l/h of CO2 —> ok to install to start and to have PID very low

Reminder

    • Re-fill with CO2 but we take 600 ppm because the pump took Air —> to think what it can be done to avoid Air intake at the re-start of the system
  • RICH2

Reminder

    • To do a O2/N2 measurement before the stop —> Mara
  • General
    • Interlock of Ar/H2 does not work —> Michal/Patrick to check
    • Crash of Auxiliary PLC —> to understand
      • Patrick explained how to re-start it and to have the file of the crash
      • Module Profibus and PLC can be touched only by Michal and PLC people
      • Also problem with Profibus cable/connector.module —> to understand where —> Patrick

 

PIQUET

  • Nothing to report

 

GENERAL

  • MFC calibration campaign preparation
    • All ok: only to swap the two lines of MWPC
  • Mixer module maintenance presented by Sabino
    • Everything in dfs
    • Mixer not stable in exhaust: no problem, it has to be stable only when it is in run
    • In two weeks at least one mixer for experiment and it is very important to give comments
  • R134a recuperation by Mara
    • Explication of the system and of first tests
    • To check DPT001, add DPT for iC4H10 buffer volume
    • Recuperation tried at 300 l/h
    • 10/15 small cycles to empty the second buffer volume
    • Time of regeneration of purifier 1 was too long and it was saturated: this happened with the software upgrade: every time there is an upgrade of software to check if recipes are saved —> Michal
    • Still some SF6 and iC4H10 in the output of R134a recuperation —> to check
    • Some problems to fix
  • Flowcell summary by Mara
    • ATLAS TGC there is Iodine
    • Some flowcell have Ag other Platinum: which are the new one?
    • T understand what to do with the TGC flowcell: change flowcell with brand-new in one rack?

 

There are minutes attached to this event. Show them.
    • 09:00 09:10
      Maintenance procedure: Mixer Module 10m
      Speaker: Sabino Zagaria (Universita & INFN Pisa (IT))
    • 09:10 09:20
      MFC calibration campaign 10m
      Speaker: Beatrice Mandelli (CERN)
    • 09:20 09:30
      R134 recuperation status 10m
      Speakers: Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
    • 09:30 09:40
      Overview of planning LS2 10m
      Speaker: Beatrice Mandelli (CERN)

      PLC:

      https://its.cern.ch/jira/secure/WBSGanttMain.jspa?filter=BOARD_345

      LS2:

      Departments/PH/Groups/TA1/Gas_group/002-LS2

    • 09:40 09:45
      Piquet interventions 5m

      http://eloggas.cern.ch/GAS_PIQUET/

      Speakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Frederic Merlet (CERN), Louis-Philippe De Menezes (CERN), Patrick Carrie (CERN), Kacper Jerzy Kapusniak (CERN), Michal Zbigniew Zimny (CERN)
    • 09:45 09:50
      Activities on-going 5m
      Speakers: Beatrice Mandelli (CERN), Frederic Merlet (CERN)
    • 09:50 10:10
      Plan of LS2 activities 20m
      Speakers: Beatrice Mandelli (CERN), Frederic Merlet (CERN), Roberto Guida (CERN)
    • 10:10 11:35
      Gas systems for the LHC experiments
      • 10:25
        ALICE 5m
        Speaker: Louis-Philippe De Menezes (CERN)
      • 10:30
        ATLAS 5m
        Speaker: Kacper Jerzy Kapusniak (CERN)
      • 10:35
        CMS 5m
        Speaker: Andrea D'Auria (CERN)
      • 10:40
        LHCb 5m
        Speaker: Patrick Carrie (CERN)
      • 10:45
        Gas analysis: standard H2O/O2 5m
        Speaker: Louis-Philippe De Menezes (CERN)
      • 10:50
        Gas web-page 5m

        http://test-gasmonitoring.web.cern.ch
        https://ep-dt-gasanalysis.web.cern.ch

        Speaker: Beatrice Mandelli (CERN)
      • 10:55
        Software 10m
        Speaker: Michal Zbigniew Zimny (CERN)
    • 11:35 12:25
      Gas System developments
      • 11:35
        Gas System Test-Bench 10m
        Speakers: Fabio Bordon (CERN), Sabino Zagaria (Universita & INFN Pisa (IT))

        Electrical work completed, to be tested.

      • 11:45
        CMS CF4 recovery 10m
        Speakers: Fabio Bordon (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR))

        recovery restarted Monday 13/01

        Ar = 5.63%
        CF4 = 93.72%

        O2 = 150 ppm
        N2 = 9388 ppm 

      • 11:55
        LHCb RICH2 CF4 recuperation 10m
        Speakers: Federico Consolaro (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR))

        recuperation finished Dec 2019 

        CF4 bottle + batteries to be analysed with GC to check quality 

        system upgrade under discussion 

      • 12:05
        R134a Recuperation 10m
        Speakers: Federico Consolaro (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Ian Crotty (University of Wisconsin Madison (US))
      • 12:15
        AoB 10m
        Speakers: Fabio Bordon (CERN), Federico Consolaro (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Mara Corbetta (Universite Claude Bernard Lyon I (FR)), Sabino Zagaria (Universita & INFN Pisa (IT))

        -New MFC 5l/h to buy for RI1

         

    • 12:25 12:35
      FSU & Jobs status 10m
      Speaker: Frederic Merlet (CERN)
    • 12:35 12:45
      AoB 10m