SBDS camera read-out

Europe/Zurich
865/1-B03 (CERN)

865/1-B03

CERN

12
Show room on map

Hardware (Stephane)

  • In a good state
  • Impedance and vacuum acceptance tests before long (tank)
  • Optical line elements expected by March
  • Installation foreseen this Summer (from June)
  • Electronics detailed from tunnel to surface (BB5)

Software (Athanasios)

  • First tests done on Proliant server (AWAKE)
  • Not clear how to best handle image acquisition (free running until trigger or freeze)
  • Need realistic test bench
  • OP (Eric) asks for SISAcquisition property notified every basic period (system alive)
  • Agreement that SBDS images will not be used to interlock injection of subsequent beams

Next steps:

  • Stephane to equip VME crate with MEN-A25 CPU + XMC with digital camera and triggers
  • Enrico to specify how to determine the best possible image (decaying as function of intensity)