GIF++ installation and schedule meeting
-
-
09:15
→
09:35
Review of last week operation & plans for this week 20m
Remember to put e-log messages when you turn ON/OFF the source, change filter etc.
User Reports / Overview :
----------------------------------
ATLAS-MM : Long term chamber installed (LM2 (Pos,D02)), will stay for a few months.
Wednesday, 2 new large detectors to installed normally on Wednesday.
New detectors are expected every Wednesday. Running from pre-mixed bottle (bank).
Discussion : Possible installation of 1 full assembled sector in Upstream. ≈ Feb. for 2 months.
Will be clarified in the coming weeks.Asking EP-DT to move a bit closer.
For one week, asking EP-DT to move, to allow using a small sTGC chamber as monitor.ATLAS - sTGC : Normally 2 chambers installed inside bunker. We now have chambers for several weeks to test. Details can be seen in the teamup schedule. Currently agreed to host 2-3 boxes in preparation area.
CMS-CSC: One setup back in normal position.
Setup from preparation area to be moved (bunker upstream or Bld. 904).EP-DT1: Discussion if possible to move closer.
EP-DT2 : Restarted last week. New (additional) detector to installed on Wednesday (?)
Request to have the default value 2.2 in upstream.CMS-DT: Rails back installed. Electronic racks to be finished.
Chamber expected to be installed around Mid March.EcoGas : Running.
CMS-RPC : Plan to restart on Monday. iRPC will stay for another month.
Trolley 1& 3 in bunker.
For this week 4.6 would be preferred. Some scans with higher absorption 6.9 or 10 for short periods.Cosmic trigger activity to continuing. So far good results.
Some modification on the frame to reinforce it needed.ATLAS-RPC: End of February to return.
LHCb : working on the irradiated prototypes removed from GIF++ some months ago.
Will be back in GIF++ most probably next year. A standalone gas line/supply will be needed this time.==========================================================
Weekly Planning : https://teamup.com/ksvh7dak8mub8k7xpe
UPSTREAM : Default filter settings : 2.2
DOWNSTREAM : Default filter settings : 1
-------------------------------------------------------------------------------------------------------
-
09:35
→
09:40
Long Term Planing - General Items 5m
---------------------------------------------------------
Gas usage at GIF : we need to compile a table of gas mixture / consumption
Gas training courses : ATEX level 1 and F-Gas training courses.
List of trained people to be collected.
-
09:40
→
09:50
New requests for tests at GIF 10m
introduction, goal of the test, plan, needs
BLM measuring campaign announced / ≈ 100 BLM, 3 days approx. First half of 2020 ?
Bulgaria academy of science -> testing of new type of radiation monitor system
A new setup of ALICE-RPC will come. More news in coming weeks.
MPI Munich would like to perform ageing tests of sMDT chambers in the GIF++ starting from about June this year.
Gas recuperation system to be installed - Responsible : Roberto
4 additional racks in Gas Service area. One containing flammable gas.
FG detection system to be installed, power needs to be provided.
(DELAYED by a few months. Will be first installed in CMS, and only later come to GIF) -
09:50
→
10:00
Infrastructure & Upgrades to the Facility 10m
Improvements needed or planned for the facility.
Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)-
LS2 restrictions & interventions 5m
Ongoing :
=============PRIMARY & RAW WATER 2/2
• Status
-
– CT2 (Primary water) : Running until 18th Oct 19 and will be stopped until 15th Apr 20.
-
– BA81 (Raw water) : Running until 17th Oct 19 and will be stopped until 17th Apr 20.
-
– BA82 (Raw water) : Running until 17th Oct 19 and will be stopped until 17th Apr 20.
-
-
Cosmic Trigger 10m
-
-
10:00
→
10:30
Announcements 30m
-
IMPACTS for 2020 5m
Guidelines for filling in IMPACT requests
List of active IMPACT declarations : https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154
General Guideline : One IMPACT per setup.
- two chambers on individual supports -> 2 IMPACT declarations
- multiple chambers swapped on same or similar support -> one IMPACT declaration
- basically, if you need two locations, please make two IMPACT declaration (clone)
Each Setup should have IMPACT label attached with number.
Attached documents : CAD file or picture.
Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).
-
-
09:15
→