    Present (in no particular order):
    Tony Cass, CERN
    Romain Wartel, CERN
    Ewan MacMahon, Oxford
    James Adams, RAL
    Ian Collier, RAL
    Martin Bly, RAL
    Jens Jensen, RAL
    David Kelsey, RAL
    John Gordon, RAL
    Keith Chadwick, FNAL
    Sander Klous, NIKEF
    Thomas Finnern, DESY
    Owen Synge, DESY
    Ian Gable, University of Victoria
    Michel Jouvin, GRIF
    Andrea Chierici, INFN Bologna

    Please note that the conference system appears to have dropped the recording of the last third of the meeting. Hence, I've had to reply on my lackluster notes. Please correct me where necessary.

     

    1. Previous Minutes

    • Tony asked for comments on the previous minutes, particularly since Ian felt they were somewhat vague.
    • Dave mentioned that this could have been the result of a vague discussion.
    • There were no comments.

     

    2. David Kelsey: discussion on the state of Policy Document.

    • Dave has just seen Thomas Finnern's contribution to the list and he will process it shortly.
    • Dave met with the JSPG last week fate to face and he gave a brief  summary of the discussion at the meeting. They decided on two names for the for the roles we have been discussing: producer, and endorser.  It was felt that the previous word 'approver' suggested to much.
    • Each endorser would have list of endorsed images, and the list would would be signed.
    • Dave plans a new revision of the Policy document incorporating comments by  next week.

     

    3. Cataloguing & Distribution (Ewan MacMahon, Martin Bly & Owen Synge)

    • Martin went through theImage Distribution Draft. Please read the document for accurate summary of what Martin said.
    • Tony commented on the necessity of having a certificate per images. He commented that there are two models (1) a signed images, with a signed list of endorsed images or (2) certificates for individual  images.
    • Romain commented that we need to avoid having to do two checksums on the  image due to the expensive nature of that operation.
    • Owen commented that one of the reasons for using certificates for  individual images is that you can reuse CRL mechanism for expiry.
    • David commented that use of certificates would be rather heavy  weight, and assigning them in a trustworthy way would be rather time  consuming.
    • David commented that it may not be possible to demand that the  producer  sign the image (say for example RedHat provided images), in  this case we can rely on the endorser.
    • Tony asked that the issue of having individual certificates for images be resolved by the security group, rather then the distribution group. This would avoid discussing it in two different places. Both  Owen and Martin agreed.
    • David mentioned that during the discussion with JSPG that there was a question about the need for expiry dates. The feeling was that a  mechanism for revocation was good enough to accomplish expiry.
    • Michel commented that he felt it was a burden to have an expiry date for images that may still be useful, and expire for no particularly reason.
    • John Gordon was concerned about having old images turning up in the absence of an expiry date. He also commented that he doesn't expect  that images will have particularly long lifetimes given the frequency  of OS patches.
    • Romain commented that we must require that endorsers do their work properly.
    • Tony commented that revocation by endorsers is preferable to relying  on expiry dates because this will require active evolvement from the  endorsers. If endorsers fail to revoke their images in a timely fashion we will know not to trust them. Michel commented that he supported this exactly.
    • Ewan commented that having expiry was a failsafe mechanism for cases  such as people forgetting about an image or leaving their job. John  commented that this was the point he way trying to make.
    • There was some discussion about if running VM instances should be  patched. Not sure is there was a conclusion here; the group needs to decide if image sites can patch images or should simply refuse to instantiate an image if they have concerns. Romain said that some fixes might not require a reboot. Tony commented that  in practice this does not happen frequently i.e. nodes are normally taken offline and rebooted for security patches. Romain agreed with this.
    • Martin commented that he would like to be able to use the same  cataloging and verification tools for the site locally produced  images( which may have no use outside the site) as would be used for  externally produced images.
    • Tony commented that his preference was that we create something that  is usable soon, and may not be as automated as we would like. We can  work on improving it after we have something that is usable.
    • Owen commented that the distribution group needs  input from the security group with regards to the certificate per  image issue to proceed.
    • Ewan suggested the distribution group proceed assuming that endorsers provide a list of valid images and define the cataloguing needs for consumer sites. Tony approved of this suggestion, asking that the group possibly consider an initial basic mechanism that could be implemented quickly (but which should nevertheless be secure) to be followed if necessary by a more complete mechanism to be delivered later. Tony was keen to avoid ending up in the MUPJ situation where deployment of glexec/scas has taken a very long time; he hoped instead that we would be able to move quickly to actually using created images, not waiting for tool deployment. Romain suggested that we ought to be able to move quickly to deployment as many existing tools could be reused.

     

    4. Next meetings 

    • Dave will produce another revision of the Policy document to be  discussed During the April 12 meeting. The revised document should be available well before April 12th so the catalogue/distribution group can review this before April 12th, but there might not be time for discussion at that meeting.
    • Face to face meeting: WIll occur Friday of HEPiX Lisbon (April 23, 2010), likely starting at 11:00 after coffee. Tony said that he hope we would be able to make significant progress on the creation policy documents and the cataloguing/distribution mechanism at the meeting, leaving us to then concentrate on technical issues such as contextualisation at future phone conferences.

     

    There are minutes attached to this event. Show them.
      • 16:00 → 16:05
        Previous Minutes 5m
        Minutes
      • 16:10 → 16:50
        Cataloguing & Distribution 40m
        Speaker: Ewan MacMahon, Martin Bly & Owen Synge
        Document
      • 16:55 → 17:00
        Agenda for next meeting 5m