GIF++ installation and schedule meeting

→ Europe/Zurich
892/1-B09 (CERN)

892/1-B09

CERN

30
Show room on map
Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN), Federico Ravotti (CERN)
There are minutes attached to this event. Show them.
    • 09:15 → 09:35
      Review of last week operation & plans for this week 20m

      Today's chair : Giuseppe & Martin

      ----------------------------------

      Remember to put e-log messages when you turn ON/OFF the source, change filter etc.

      User Reports / Overview :

      Follow up : Stop of CO2.

      ----------------------------------

      ATLAS-MM :  (Alain, room)

      the plan for this week and next one is the following:

      - Long term LM2 M7 detector will be removed today.
      ≈ 2 week later new long term (≈ 3 months) SM1

      - 2 detectors normally tested for one week in position D3 - D4 for the upcoming future.

      Urgent request : EP-DT1 has lead blocks inside the radiation cone, causing a significant shadow on the long term chamber. Needs to be solved asap.  - Setup moved out of way.

      Discussion : Possible installation of 1 full assembled sector in Upstream. ≈ Feb. for 2 months.
      Will be clarified in the coming weeks.

      Katerina checked the cables/pipes and there is the possibility to move her setup close to the source by 50cm.

      ATLAS - sTGC : (Gerardo, room) 2 chambers installed inside bunker. We now have chambers for several weeks to test. Details can be seen in the teamup schedule. Currently agreed to host 2-3 boxes in preparation area.

      CMS-CSC:  (Katerina, Vidyo) One setup back in normal position, to be moved closer to source on Friday.
      Potential damage from the CO2 cut ?  - Cooling will be moved to the infrastructure line tomorrow.

      EP-DT1:  (Gianluca, room) Currently out of cone,  will come back  beginning of April.

      EP-DT2 :   (Gianluca room) Irradiating. Request to have the default value 2.2 upstream as soon as possible.
      Using GC for today and tomorrow.

      CMS-DT:  (Barbara, Vidyo) Rails installed back. Electronic racks to be finished.
      Work will intensify around 16 March.  Chambers to be installed in the bunker around 25.03.

      EcoGas : (Gianluca, room) Running.  Need of stable conditions.

      CMS-RPC :  (again, not present)  iRPC will stay for another month. 
      Trolley 1& 3 in bunker.  Measurements with filter 46000 are done. 

      Cosmic trigger activity to continuing. So far good results. 

      ATLAS-RPC: (not present, but report) - BIS78 one setup to come back in 1-2 weeks
      ATL-RPC high rate small prototype disconnected, outside bunker for the moment.

      ==========================================================

      Weekly Planning :   https://teamup.com/ksvh7dak8mub8k7xpe 

      UPSTREAM : Default filter settings :  2.2 

      DOWNSTREAM :  Default filter settings :  1

      -------------------------------------------------------------------------------------------------------

       

    • 09:35 → 09:40
      Long Term Planing - General Items 5m

      ---------------------------------------------------------

      Gas usage at GIF :  we need to compile a table of gas mixture / consumption

      Gas training courses : ATEX level 1  and F-Gas training courses.
      List of trained people to be collected.
       

    • 09:40 → 09:50
      New requests for tests at GIF 10m

      introduction, goal of the test, plan, needs

      BLM measuring campaign announced / ≈ 100 BLM, 2 days approx. 
      Dates to be confirmed soon.

      Bulgaria academy of science -> testing of new type of radiation monitor system

      A new setup of ALICE-RPC will come. More news in coming weeks.

      MPI Munich would like to perform ageing tests of sMDT chambers in the GIF++ starting from about June this year.

      Lab on Fiber (LOF) dosimeter

      Gas recuperation system to be installed - Responsible : Roberto
      4 additional racks in Gas Service area. One containing flammable gas.
      FG detection system to be installed, power needs to be provided.
      (DELAYED by a few months. Will be first installed in CMS, and only later come to GIF)

    • 09:50 → 10:00
      Infrastructure & Upgrades to the Facility 10m

      Improvements needed or planned for the facility.

      Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)

      Improvements to the gas monitoring (incoming / primary) needed ?

       

      EHN1 AUG Test scheduled for beginning of April. - POSTPONED to JUNE/JULY

      Need to install a gas patch panel in the upstream area. To be scheduled.

      • LS2 restrictions & interventions 5m

        Ongoing :
        =============

        PRIMARY & RAW WATER 2/2

        • Status

        • –  CT2 (Primary water) : Running until 18th Oct 19 and will be stopped until 15th Apr 20.

        • –  BA81 (Raw water) : Running until 17th Oct 19 and will be stopped until 17th Apr 20.

        • –  BA82 (Raw water) : Running until 17th Oct 19 and will be stopped until 17th Apr 20.

      • Cosmic Trigger 10m
    • 10:00 → 10:30
      Announcements 30m
      • IMPACTS for 2020 5m

        Guidelines for filling in IMPACT requests

        List of active IMPACT declarations : https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154

        General Guideline : One IMPACT per setup.

        • two chambers on individual supports -> 2 IMPACT declarations
        • multiple chambers swapped on same or similar support -> one IMPACT declaration
        • basically, if you need two locations, please make two IMPACT declaration (clone)

        Each Setup should have IMPACT label attached with number.
        Attached documents : CAD file  or  picture.
        Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).

      • New Announcements 5m
      • AOB 5m