GIF++ installation and schedule meeting
-
-
14:00
→
14:20
Review of last week operation & plans for this week 20m
Remember to put e-log messages when you turn ON/OFF the source, change filter etc.
User Reports / Overview :
Stop of CO2 on Monday morning.
----------------------------------
ATLAS-MM : (Alain)the plan for this week and next one is the following:
- Long term LM2 M7 detector will stay up to 04.03, then removed.
≈ 1 week later new long term (≈ 3 months) SM1- 2 detectors normally tested for one week in position D3 - D4 for the upcoming future.
- Scan requests already in TeamUp.
- filed mapping to organise for next weekUrgent request : EP-DT1 has lead blocks inside the radiation cone, causing a significant shadow on the long term chamber. Needs to be solved asap.
Discussion : Possible installation of 1 full assembled sector in Upstream. ≈ Feb. for 2 months.
Will be clarified in the coming weeks.Katerina checked the cables/pipes and there is the possibility to move her setup close to the source by 50cm.
ATLAS - sTGC : (not present) 1 chambers installed inside bunker. We now have chambers for several weeks to test. Details can be seen in the teamup schedule. Currently agreed to host 2-3 boxes in preparation area.
CMS-CSC: (Katerina) One setup back in normal position.
Potential damage from the CO2 cut ?EP-DT1: (Gianluca) Discussion if possible to move closer. For the moment is fine. No irradiation till mid-March, only source scan every Wednesday. From beginning of March it would be nice to install another setup. Position and installation to check together in the bunker directly.
EP-DT2 : (Gianluca) Irradiating. Request to have the default value 2.2 upstream as soon as possible.
CMS-DT: Rails installed back. Electronic racks to be finished. Cosmic run started on Wed Jan 29th
Work will intensify around 16 March. Chambers to be installed in the bunker around 25.03.EcoGas : (Gianluca) Running. Need of stable conditions and
CMS-RPC : (not present) iRPC will stay for another month.
Trolley 1& 3 in bunker. Measurements with filter 46000 are done.Cosmic trigger activity to continuing. So far good results.
ATLAS-RPC: (Alessandro) ATL-RPC high rate small prototype inside bunker, below CMS-CSC.
LHCb : (not present) working on the irradiated prototypes removed from GIF++ some months ago.
Will be back in GIF++ most probably next year. A standalone gas line/supply will be needed this time.==========================================================
Weekly Planning : https://teamup.com/ksvh7dak8mub8k7xpe
UPSTREAM : Default filter settings : 2.2
DOWNSTREAM : Default filter settings : 1
-------------------------------------------------------------------------------------------------------
-
14:20
→
14:25
Long Term Planing - General Items 5m
---------------------------------------------------------
Gas usage at GIF : we need to compile a table of gas mixture / consumption
Gas training courses : ATEX level 1 and F-Gas training courses.
List of trained people to be collected.
-
14:25
→
14:35
New requests for tests at GIF 10m
introduction, goal of the test, plan, needs
ATL-RPC high rate prototype
BLM measuring campaign announced / ≈ 100 BLM, 2 days approx. Most probably a good period would be from March 09th.
Bulgaria academy of science -> testing of new type of radiation monitor system
A new setup of ALICE-RPC will come. More news in coming weeks.
MPI Munich would like to perform ageing tests of sMDT chambers in the GIF++ starting from about June this year.
Lab on Fiber (LOF) dosimeter
Gas recuperation system to be installed - Responsible : Roberto
4 additional racks in Gas Service area. One containing flammable gas.
FG detection system to be installed, power needs to be provided.
(DELAYED by a few months. Will be first installed in CMS, and only later come to GIF) -
14:35
→
14:45
Infrastructure & Upgrades to the Facility 10m
Improvements needed or planned for the facility.
Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)-
LS2 restrictions & interventions 5m
Ongoing :
=============PRIMARY & RAW WATER 2/2
• Status
-
– CT2 (Primary water) : Running until 18th Oct 19 and will be stopped until 15th Apr 20.
-
– BA81 (Raw water) : Running until 17th Oct 19 and will be stopped until 17th Apr 20.
-
– BA82 (Raw water) : Running until 17th Oct 19 and will be stopped until 17th Apr 20.
-
-
Cosmic Trigger 10m
-
-
14:45
→
15:15
Announcements 30m
-
IMPACTS for 2020 5m
Guidelines for filling in IMPACT requests
List of active IMPACT declarations : https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154
General Guideline : One IMPACT per setup.
- two chambers on individual supports -> 2 IMPACT declarations
- multiple chambers swapped on same or similar support -> one IMPACT declaration
- basically, if you need two locations, please make two IMPACT declaration (clone)
Each Setup should have IMPACT label attached with number.
Attached documents : CAD file or picture.
Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).
-
-