LIU-SPS Machine Coordination Meeting 18/3/2020

Present: Andy Butterworth, Anthony Rey, Brennan Goddard, David Mcfarlane, Elena Chapochnikova, Eric Veyrunes, Fabio Follin, Francesco Maria Velotti, Frank Gerigk, Giulia Papotti, Gregoire Hagman, Hannes Bartosik, Ivan Karpov, James Ridewood, Johan Dalla-Costa, Kevin Shing Bruce Li, Lars Jensen, Luciana Kolbeck, Marine Gourber-Pace, Philippe Baudrenghien, Reyes Alemany Fernandez, Stephane Cettour Cave, Verena Kain. 

Coarse version - original minutes got lost during connection loss with server.

Matters arising

  • Today's agenda will be carried out as planned; it will be seen, how we will proceed with these meetings in the future.
  • Most actions followed up; Johan is in close contact for sorting out questions for logging. Will need to schedule a follow-up on this in the near future. RF items checked. Most questions are clear. High level parameters document in preparation.
  • ALPS Dry run successful; issues with YASP are already fixed but not yet released.

Dry runs and test progress news (Kevin/Verena)

How to calibrate 800 MHz phase with beam (Giulia)

  • 800 MHz phase calibration and locking to the 200 MHz phase.
  • 2 method exist for doing this - via beam loading and via bunch tilt.
  • Beam loading works better at flat top and is not typically used at flat bottom; Python scripts exist to automate the calibration process.
  • Bunch tilt can be done throughout the cycle. Ideally, in the future, this is linked to the ABWLM used as diagnostics. Python scripts are under development.
  • Calibration could be done via an application - Giulia remarked that one would need to learn how stable and reproduceable a calibration is once done; based on how often this would actually need to be done per year, one can then see whether it makes sense to try and encode the procedure as automated process into an application. For the time being, RF is still refining the algorithms; they will get back to OP for any support needed.
  • All required settings are present in LSA for doing the phase calibration (recently added: relative phase shift between 800 MHz and 200 MHz)
  • In terms of accuracy, there will always be an uncompensated phase shift due to transient beam loading. Therefore, the goal is to try and lock the phase correctly for the central bunches. One needs to accept a phase error in the order of 1 (200 MHz units) or 4 (800 MHz units) degrees.

Algorithms to take into account power limitations (Ivan)

  • Ivan explains the relations between maximum voltage and intensity based on power limitations. For low intensity beams, this is essentially a quadratic relationship and the ideal voltage partitioning can be readily calculated.
  • In general, the power limit relations are intensity dependent.
  • Moreover, voltage partitioning would need to change as function of time along the cycle. This has already been like this in the past. In the future, we have VMax per line as function in LSA that will enable to fine tune the partitioning throughout the cycle.
  • For ideal operation, in the future, power limits per line can be given to optimize each line individually. Details of the algorithm are still under investigation.
  • Elena mentioned that the detailed formalism for automated voltage partitioning still needs to be finalized. Also, a discussion with the power tam will be required to understand some details of the power system (ACTION: Elena to check with Eric).
  • Hannes asked about the cycle length presented on Ivan's slides. Elena clarified that the actual cycle length depends on the assumptions, in particular, the filling factor used for the calculations, where one can be more or less optimistic. Ivan based his calculations on the current settings on LSA. 

Understanding limitations of RF system pre- and post-LS2 (Elena)

  • Elena has investigated the reasons behind potential voltage limitations for low intensity beams in the past as well as potential limitations in the future. The study is ongoing.
  • Philippe stressed that the LLRF power consumption could reach levels of 20% and must absolutely be taken into account for the computations.
  • Brennan stressed that the power team should be involved to understand better the mechanics and origin of the power limitations and how to correctly take these into account.

AOB

  • David mentioned that the SPS is now closed and in X-Mas shutdown mode; all IMPACTS are blocked from now on; for any urgent access he should be contacted.

Next meeting: 25/3/2020 (chair Brennan)

Draft agenda

  • check lists of ISTs James
  • Implementation of FFA in LSA Kevin/Giulia
  • RF dry run outcome: generation 2 Kevin
  • Kicker temperature and pressure cycles in view of scrubbing Francesco