LIU-SPS Machine Coordination Meeting 11/2/2020

Present: Andy Butterworth,Anthony Rey ,Brennan Goddard,Etienne Carlier ,Fabio Follin ,Francesco Maria Velotti ,Giulia Papotti ,Gregoire Hagmann ,Hannes Bartosik ,James Ridewood ,Johan Dalla-Costa, Kevin Shing Bruce Li ,Lars Jensen, Verena Kain, Stephane Cettour Cave, Yannick Le Borgne, Reyes Alemany Fernandez, Philippe Baudrenghien

  • IST follow up will be through ACE with the checklists now available for OP to keep track, will link to the MCM meeting page
  • FESA readiness dates, important to keep up to date, will go through the lists to see if any changes, and also check that deadlines in next 2 weeks will be met.
  • SPSQC being checked, M. Zerlauth came to the MPP last week; going though the number shows to do a vertical slice test actually; need to plan this.
  • DSO tests for ABT: there are two open questions: not clear about the access tests foreseen. MKE and kickers will not be ready; however, the power converters could be ready for testing. If this works, all power converters can be tested under real conditions, same for the EIS and the obstacles; other question is the impact of the SBDS tests on the access system tests. The SBDS has a link to the chain1. This is the same as done in the LHC (ACTION: Etienne to check this and follow up; to be clarified also with Pieter van Trappen).
  • LS2C follow up still open (Brennan/Malika)
  • COLDEX also needs to be followed up for HWC and ISTs and scrubbing (Kevin)
  • Francesco and Chiara still working on docs

Dry runs and test progress news (Kevin/Verena)

Logging: what, how, required input, plans, milestones, tools, checks, dry-runs (Johan)

  • First part, logging variables, second part, what to do with changed devices.
  • Verena mentions that the 444 entries of the statistics needs to be checked; if this needs to be done like this. Anthony also questioned whether the statistics tree in its current shape is even still needed and could be changed today; today's shape is rather historically motivated.
  • Brennan stressed that we should not delete old parameters but just stop their logging (ACTION: decide what to do with parameters that are no longer logged - have a separate tree for this?)
  • Run through individual cases:
    • BCT --> proposition: propositions accepted --> Lars asked for a documentation of the main changes (i.e. simple table with changes)
    • Scraper --> proposition: as shown
    • BLMs: change of names plus running sums... (ACTION: to be checked what type of data we want to log and if this is compatible with the NXCALs capacities.)
    • FEI: today we have mains and septa logged; would be good to have logged also sextupoles, octupoles, maybe not CODs. Same questions for the transfer lines (ACTION: Johan to get in touch with FGC teams to check how this is best done).
  • Brennan asked about vacuum (ACTION: Johan to check with Chiara if this is up to date and what to do with this).
  • Verena added that everything will be put into NXCALs; it needs to be clarified that all old settings have been put into NXCALs (ACTION: Johan to take this into account). Verena also added that one check how to move to the new logging. Hierarchy is not yet present.
  • Reyes commented that on the 30 April there will be a tutorial by CO during the OP shutdown lectures. Fabio mentioned that this is not evident. Stephane asked whether NXCALs has a mechanism to ensure that devices are logging.
  • Hannes wondered whether even the remaining 32 BCT data are actually important.
  • CALS will be turned off end of the year.

FFA parameters (Giulia)

  • Giulia wraps up the FFA parameter model; fRF_off is played during the time when the RF power of low; the counters still keep counting to ensure a net h=4620.
  • Giulia will hand over the frequency programs to Anthony which then can be implemented in LSA (ACTION: Giulia, Anthony, Kevin, Greg).
  • Greg mentioned that one could remove f_RF200 and just work with f_rev (ACTION: clarify with Greg).
  • Philippe wants to re-discuss the the parameterization of (ACTION: discuss this offline with Philippe and Arthur).
  • Magic h can stay hard coded for now.
  • Verena mentioned to prepare different colors of high level and actually sent to the HW to ease the discussion.
  • The concept is perfectly well suited for the NA ions as well as slip stacking which takes place above FFA cut-off.

200 MHz cavity loops parameters model (Greg)

  • Review of cavity control architecture.
  • Feed-foreward will be coming later. Gerg mentioned the FESA interface documented in EDMS which details all functions that will be exclusively imported from FESA. There will be no functions in the polar loop.
  • What can Anthony do to prepare today? When will we have an interface to connect to?  What is to be expected to be done? --> At this point there is not much that can be done in addition other that to document the voltage partitioning and higher level parameters (ACTION: document high level parameters in EDMS document; could append to Greg's document).
  • Reyes asked for providing default values always; all the default values are provided in the document. Anthony has done this also for the 800 MHz. Anthony asked for having access to the EDMS documents (ACTION: Greg to check distribution lists for EDMS documents); Anthony also mentioned that parameters that will be tune frequently should be highlighted in some form.
  • Cavity grouping needs to be discussed; docs need to be provided (ACTION: follow up on the parameter groups in LSA).
  • Kevin asked when we can have the FESA classes ready; this is still foreseen for this month. Anthony can already start preparing value generators;
  • Scheme of grouping in LSA still needs to be discussed (grouping in LSA?)

ALPS dry run results (Verena/Kevin)

  • Test of turn-by-turn mode with muti-turn application - ALPS electronics installed in BA3 and BA6
  • Strange behaving BAs have been identified
  • Logging is still an open question - on-demand logging on NXCALS could be done using YETS 2021/22, for LHC would be too much work (ACTION: follow-up on logging in general also with CO)
  • Reyes mentioned that on-demand logging is solved at the FESA level (to be checked)

AOB

  • Planning in LSS5 might be impacted by extreme
  • Verena and Kevin to check with Francesco whether some dry run can be done before
  • Verena to prepare one slide on SDDS / NXCALs on demand logging

Next meeting: 18/3/2020 (chair Kevin)

Draft agenda

  • How to calibrate 800 MHz phase with beam Giulia
  • Algorithms to take into account power limitations Ivan
  • Understanding limitations of RF system pre- and post-LS2 Elena

 