GridPP Technical Meeting - PerfSonar Refresh
Virtual Only
Weekly meeting slot for technical topics. We will try and focus on one topic per meeting. We will announce at the Tuesday Ops meeting if this meeting is going ahead and if so the topic to be discussed.
Duncan presented his slides:
Elena asked for the instructions for setting up perfSonar boxes to be circulated. Duncan will email them to TB support and Alastair will add them to the minutes. Installation guide: https://opensciencegrid.org/networking/perfsonar/installation/ . It would be useful if they could also be added to the GridPP wiki
Brian asked about Jumbo frames and if there was a WLCG policy on them.Duncan didn’t believe there was. QMUL said:
“Turning on jumbo frames should not cause any problems with any hosts/networks which do not support them; therefore, it makes sense to leave them on as two sites both using jumbo frames will just automatically use them otherwise frame size will be reduced to that of the network with the smallest frame size.”
QMUL asked if it was necessary to keep the archive:
"Local measurement archive backup is not needed as OSG/WLCG stores all measurements centrally. In case you'd like to perform the backup anyway please follow the migration guide."
https://opensciencegrid.org/networking/perfsonar/installation/
Sites
RAL-LCG2
Hardware has been delivered. Still in boxes as it is not a clear . Realistic time frame of October for deployment.
Bristol
Building still closed, new Perfsonar hardware still with delivery/vendor
QMUL
New 100Gb-capable perfSONAR hardware has been deployed into rack, connected to 100Gb switch and has IPv4/IPv6 connectivity w/ jumbo frames. We would like to migrate the PMA (perfSONAR Measurement Archive) from our existing perfSONAR hosts but if this is not necessary, we don’t have a problem in simply changing our DNS records to point to the new host and consider the PMA on the existing hosts as ‘lost’.
As the existing hosts require physical access in order to gain shell access, migrating the data is somewhat difficult as our Mile End campus is still under lockdown with limited access available to us.
Imperial
Server racked in the machine room.
RHUL
New node is installed but sitting in a temporary rack in our dept, awaiting the resumption of the portering service to move it to the data centre. (Simon)
Brunel
We have received our perfsonar, but we have two problems:
- restrictions on access to racks, due to COVID limitations;
- restrictions due to network upgrade that should have been done before the lockdown.
Lancaster
The new Lancaster perfsonar box is in the rack and I hope to have it installed and configured soon, but it's having to take a back seat for a big cluster overhaul happening towards the end of June. I will be online by the end of June, but probably not until right near the end of June.
Glasgow
Hardware has been delivered. Sam didn’t feel qualified to comment on the exact status.
ECDF
Done (before Covid-19 caused problems).
Durham
Done. They are seeing asymmetric routing, which is being investigated.
Oxford
Managed to rack up the boxes last week. Will try and install them in the coming couple of weeks.