GridPP Technical Meeting - PerfSonar Refresh

→ Europe/London
Virtual Only

Virtual Only

Alastair Dewhurst (Science and Technology Facilities Council STFC (GB)), Andrew McNab (University of Manchester), David Colling (Imperial College Sci., Tech. & Med. (GB))
Description

Weekly meeting slot for technical topics. We will try and focus on one topic per meeting.  We will announce at the Tuesday Ops meeting if this meeting is going ahead and if so the topic to be discussed.

Duncan presented his slides:

https://indico.cern.ch/event/921654/contributions/3872137/attachments/2047568/3430977/GridPP-perfSONAR-technical-meeting.pdf

Elena asked for the instructions for setting up perfSonar boxes to be circulated.  Duncan will email them to TB support and Alastair will add them to the minutes. Installation guide: https://opensciencegrid.org/networking/perfsonar/installation/ .  It would be useful if they could also be added to the GridPP wiki

Brian asked about Jumbo frames and if there was a WLCG policy on them.Duncan didn’t believe there was.  QMUL said:

“Turning on jumbo frames should not cause any problems with any hosts/networks which do not support them; therefore, it makes sense to leave them on as two sites both using jumbo frames will just automatically use them otherwise frame size will be reduced to that of the network with the smallest frame size.”

QMUL asked if it was necessary to keep the archive:

"Local measurement archive backup is not needed as OSG/WLCG stores all measurements centrally. In case you'd like to perform the backup anyway please follow the migration guide."

https://opensciencegrid.org/networking/perfsonar/installation/

Sites

RAL-LCG2

Hardware has been delivered.  Still in boxes as it is not a clear .  Realistic time frame of October for deployment.

Bristol

Building still closed, new Perfsonar hardware still with delivery/vendor

QMUL

New 100Gb-capable perfSONAR hardware has been deployed into rack, connected to 100Gb switch and has IPv4/IPv6 connectivity w/ jumbo frames.  We would like to migrate the PMA (perfSONAR Measurement Archive) from our existing perfSONAR hosts but if this is not necessary, we don’t have a problem in simply changing our DNS records to point to the new host and consider the PMA on the existing hosts as ‘lost’.

As the existing hosts require physical access in order to gain shell access, migrating the data is somewhat difficult as our Mile End campus is still under lockdown with limited access available to us.

Imperial

Server racked in the machine room. 

RHUL

New node is installed but sitting in a temporary rack in our dept, awaiting the resumption of the portering service to move it to the data centre. (Simon)

Brunel

We have received our perfsonar, but we have two problems:

 - restrictions on access to racks, due to COVID limitations;

 - restrictions due to network upgrade that should have been done before the lockdown.

Lancaster

The new Lancaster perfsonar box is in the rack and I hope to have it installed and configured soon, but it's having to take a back seat for a big cluster overhaul happening towards the end of June. I will be online by the end of June, but probably not until right near the end of June.

Glasgow

Hardware has been delivered.  Sam didn’t feel qualified to comment on the exact status.  

ECDF

Done (before Covid-19 caused problems).  

Durham

Done.  They are seeing asymmetric routing, which is being investigated.

Oxford

Managed to rack up the boxes last week.  Will try and install them in the coming couple of weeks.

There are minutes attached to this event. Show them.
    • 11:00 → 11:20
      PerfSonar Deployment Status 20m
      Speakers: Alastair Dewhurst (Science and Technology Facilities Council STFC (GB)), Duncan Rand (Imperial College (GB)), Terry Froy (Queen Mary University of London), Tim Chown (Jisc)
    • 11:20 → 11:45
      Site Round Table 25m
      Speaker: Alastair Dewhurst (Science and Technology Facilities Council STFC (GB))
    • 11:45 → 12:00
      AoB 15m