PASTE meeting
2-R-014
CERN
Production and PASTE Meeting, 11th April 2010, CERN
Chair: A.Tsaregorodtsev
Minutes: F.Stagni
CERN: J.Closier, Z.Mathe, S.Paterson, M.Rashid, R.Santinelli, F.Stagni, A.C.Smith, S.Perazzini (production shifter)
Phone: M.Sapunov, A.Tsaregorodtsev, E.Lanciotti, R.Nandakumar
0. Ongoing Action List
Updated in Savannah task list.
1. Production Issues
Stuart commented that is necessary to have a protection at the bookkeeping level to avoid users (and productions) to look for files that should not be used. A solution has been discussed in the meeting.
2. DIRAC Release Update
- Upcoming v5r4 release
The pre-release is in certification. Some more changes has to be put in the next pre-release, especially for the new workflows which have been commissioned. These new workflows will be anyway tested locally by Stuart (there are no raw files for testing the production in the certification system). The pre-release will be put in certification just after the meeting.
A proposal has been made by Andrew to start the certification systems from scratch every time (DBs included). Andrei thinks this point is valid, and will think about it.
3. DIRAC Tasks
- DMS status
The new stager, which was in the previous release, was not used up to now. Andrew asked for it to be used from the upcoming release.
- Documentation
Federico commented that a couple of links should be added as direct links to the "help" section of the DIRAC portal: the shifter's guide, and instructions on how to renew certificates.
4. AOB
- Tomorrow is the last day to submit the CHEP abstracts. Andrew is writing the last pending one.
- volhcb17.cern.ch is still not a production instance: Andrew commented that accounting does not work, Federico commented that also some RSS links are missing.