LIU-SPS Coordination Meeting
Zoom
LIU-SPS Machine Coordination Meeting 25/11/2020
Present: Alexander Huschauer, Andy Butterworth, Anne Funken, Anthony Rey ,Antonio Grande Mallavia, Arthur Spierer, Brennan Goddard,Chiara Pasquino, David Mcfarlane, David Nisbet, Elena Shaposhnikova, Eric Montesinos, Eric Veyrunes, Etienne Carlier ,Fabio Follin ,Francesco Maria Velotti ,François-Xavier Nuiry, Frank Gerigk, Gerd Kotzian, Giovanni Rumolo, Giulia Papotti ,Gregoire Hagmann ,Grzegorz Kruk, Hannes Bartosik , Ivan Karpov, Ivan Romera Ramirez, James Ridewood ,Johan Dalla-Costa, Jonathan Meignan, Julie Coupard, Kevin Shing Bruce Li ,Lars Jensen, Loic De Oliveira, Louis Pereira, Luciana Kolbeck, Malika Meddahi, Marine Gourber-Pace, Mauro Taborelli, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Sonia Bartolome Jimenez, Stephane Cettour Cave, Sylvie Prodon, Verena Kain, Wolfgang Hofle, Yannick Le Borgne.
Matters arising and actions
- Done: Dynamic injection pattern to synchronise with timing system and BQM, being followed-up.
- VSC storage of some samples under vacuum not yet followed up; to be checked with team
- High intensity scrubbing coating strategy for LS3; still open and needs to be folded into the schedule for 2023 --> Chiara will look into this
- Can't have both long and short ion cycle in the SC, as too long, OP will look at longer term removal of this limit (SPS-OP)
- Update on ions commissioning planning: Discussions took place within RF; the sequence of steps needed for ion commissioning being prepared together with Reyes to come up with a solid plan, based on the time required for the different steps.
- RF power interlocking implemented for Thales. Still to be clarified how this will be implemented for the Siemens and Philips plants. --> in progress
- Blow-up status shown somehow in scraper application --> being looked at by Giulia and Eric
- Send out request for logging checks to equipment groups (Kevin)
- Inform about the use of the new loggbook
News on dry-run and test progress
- There will be the ALPS interlock Dry Run this afternoon from the CCC
Results from 915 MHz HOM damping measurements (Patrick Kramer)
Issues with fast valves in BA2 and strategy (Chiara Pasquino)
- BA2 fast valves --> VVFA are fastest vales and are most critical for protection for ZS
- VVFB 21801 (between MST and MSE) is still blocked open; issues with compressor distribution - actuator not moving and will not react in case an interlocked to it; other VFFBs are still working
- No VVFB spares available at CERN and are not produced any longer (newer versions available)
- Value itself reacts quickly; overall response time is still slow... 0.5s.
- Question was raised whether to block open all valves or to block open only the critical ones;
- LSS2 vacuum interlock system as it is today would not be suited to fully protect the ZS; an upgrade could be made if this would make sense;
- Question was whether interception devices are enough to protect the ZS. Brennan said they are designed to protect the ZS is they are correctly set up; these are particularly for fast failures; however, the vacuum system would provide a second layer of protection. There are other sources of failures; Brennan would prefer to have the vacuum system protection in place;
- To define a possible protection consolidation path --> medium term study to decide about consolidation of VSC; failure scenarios, time scales, protection mechanisms etc. (ACTION: ABT with VSC)
- It was decided to block the two valves 21801 and 2 open in any case; in parallel to launch a mid-term study to evaluate potential consolidation options
Update on SPS-LHC energy matching (Verena Kain)
- Large fill-to-fill variations in injection energy error from SPS to LHC; batch-by-batch is less pronounced;
- Correction will be done in the short term on the LHC side; mechanisms are already there; correction will be done using the 12 bunches;
- IQC delivers energy errors and can be picked up by YASP and using horizontal orbit correctors to correct for the energy error (comes with a tune shift which also needs to be corrected) -- all trims reverted once ramp is started;
- New measurements of bunch-by-bunch energy and phase errors; using high resolution long. bunch profiles and tomography and speeding up the tomography part using ML techniques; this could give additional input
- Elena: why would you need bunch-by-bunch error measurements?; Kevin: additional benefit would be not so much in terms of energy correction but rather improved diagnostics in general;
- Hannes: would a second cross check be done with another 12 bunches? Verena says this should not have to be the case;
- Heiko: is it fully sufficient to only correct in the LHC? In the smaller machines, a correction also needs to be done in the sending machine. Verena answers that one would have to see that, but in the past, we only always corrected in the LHC;
- Elena: if we believe that we don't expect big changes within one fill and if we learn about the difference between pilot and normal cycle, then we can already anticipate differences and fold this in. Verena says that this needs to be studies during the run; measurement and correction should in any case now be routinely be done;
- Hannes: who will do the daily measurement and follow up of the energy error? Verena said that this should all be automated within the OP applications; Verena proposed that the shift crew would need to take values and trim according to given procedures through the ICO and sequencer tasks, for example; in the beginning the LHC EICs would be in charge of this;
Round Table
-
- Verena: Etienne still has few questions fro MKP interlocks to injection system; Eric is checking this already; Jerome Landau also has a couple of questions; for LHC line all is clarified, for TT20 a few things still have to be checked; new logbook instance being created this morning for the SPS --> Brennan asked for an e-mail to be sent out for this so that everyone is informed to all groups and commissioning contacts etc.
- Chiara: WS wire exchanges done last week (BA4 and BA5); otherwise all on track;
- David: on to the final slog; concerns getting quite a few people that do not seem to be aware that machine is closing on 4th December; all main works are done;
- Francesco: extraction models are all online (Q20 and AWAKE & HiRadMat and SFTPRO still to come)
- Lars: update on wire scanners and replacement have been done --> should be more robust than before;
AOB
- Changes to the ion beam commissioning planning following the schedule modifications (Reyes)
- Philippe will present today the plans internally in the RF group - he will come back and will then present this at the next SPS MCM;
- Action for everybody to look at existing BPT plots: is there anything missing?