LIU-SPS Machine Coordination Meeting 09/12/2020

Present: Alexander Huschauer, Andy Butterworth, Anne Funken, Anthony Rey ,Antonio Grande Mallavia, Arthur Spierer, Brennan Goddard,Chiara Pasquino, David Mcfarlane, David Nisbet, Elena Chapochnikova, Eric Montesinos, Eric Veyrunes, Etienne Carlier ,Fabio Follin ,Francesco Maria Velotti ,François-Xavier Nuiry, Frank Gerigk, Gerd Kotzian, Giovanni Rumolo, Giulia Papotti ,Gregoire Hagmann ,Grzegorz Kruk, Hannes Bartosik , Ivan Karpov, Ivan Romera Ramirez, James Ridewood ,Johan Dalla-Costa, Jonathan Meignan, Julie Coupard, Kevin Shing Bruce Li ,Lars Jensen, Loic De Oliveira, Louis Pereira, Luciana Kolbeck, Malika Meddahi, Marine Gourber-Pace, Mauro Taborelli, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Sonia Bartolome Jimenez, Stephane Cettour Cave, Sylvie Prodon, Verena Kain, Wolfgang Hofle, Yannick Le Borgne, Felix Armborst, Patrick Kramer

Matters arising and actions

  • VSC storage of some samples under vacuum not yet followed up; to be checked with team;
  • High intensity scrubbing coating strategy for LS3; still open and needs to be folded into the schedule for 2023 --> Chiara will look into this;
  • Can't have both long and short ion cycle in the SC, as too long, OP will look at longer term removal of this limit (SPS-OP);
  • Send out request for logging checks to equipment groups (Kevin);
  • Inform about the use of the new logbook;
  • Reyes to prepare shutdown lecture for "using optimisation tools in the control room";
  • Does RF need to have another discussion on margins and interlock thresholds for power/voltage requirements? Elena asked to cross check the values of thresholds;
  • Intermediate check point to be added for 2021 ion commissioning;
  • Supercycle preparation: June 2021: short ion test cycle past transition;
  • Done: Blow-up status shown somehow in scraper application --> being looked at by Giulia and Eric;
  • New: OP to come up with a plan on how to continue the transverse damper integration
  • New: Clarify budget for cut cable replacement with EN-EL (Brennan)
  • Ion commissioning schedule - reasonable and seems to fit within allocated; full commissioning with fine tuning of HL-LHC ions not done by end of 2021; prioritization might be needed for slip stacking mechanics vs. stabilization;
  • ML for functions was discussed;

News on dry-run and test progress

Plans for the SPS damper (TBC - Felix)

  • HL parameter to control all TFB HW systems for all injectors; combination of LSA, FESA, CCDE, CCM, UCAP, GUI
  • All logics stuck in LSA / Makerules and UCAP; GUI as monitor and control interface
  • HL parameter class ALLTFBHLP class, integrates all HL parameter worked out within the TFBWG - already implemented in CCDE.
  • Philosophy and design choices were presented: modularity, simplicity, intelligence in Makerules
  • Kevin asked where we are we with Makerules etc? Felix said that these are not available yet for OP for the moment;
  • Verena asked whether we already have a person allocated who will write the Makerules; Felix answered that nobody has been allocated for the time after he has left;
  • Verena stressed that whatever we do now, it should be a solution that can stay across the complex in terms of personnel. It should all remain a synergy across injectors;

Results from 915 MHz HOM damping measurements (Patrick)

  • 915 MHz HOM which is problematic for FT beam in the SPS - instabilities occur after transition
  • Active feedback could provide a means of combating the HOM for 915 MHz;
  • Kevin asked how transferable this method is and whether it could it also be used also for other modes? Patrick replied that, although it is usually only used for the fundamental mode, this method can in principle be used for any HOM;
  • Large delays can be an issue; this will have an impact on the real system with delays of > 1us --> system needs to be installed close to the cavities, in the tunnel;
  • Active feedback proved successful in lab measurements on real system;
  • Christine: the principle was never documented; Patrick followed the path, at the moment we will not need a huge amplifier for this, so it is totally envisage to install an amplifier there; emphasize that this mode is a problem for FT beam; mode identification on slide 8 is a big problem at the moment as tunnel access is no longer possible; Christine asked about slide 6 the red trace with 50 Ohm load, what will be seen with complex loads? Patrick said that we don't see a large change;

AOB:

  • Status of tomography in the SPS (Giulia)

    • Updates on HW status, not much change on SW, FESA work not started yet; APP from PSB will be reused
    • Rebuild of attenuator box required - but no blocking points identified
    • Optical link evaluation done - decided to go for product 2, procurement started; --> would still be ready for first beam in April 2021;
    • SIS monitoring should be foreseen
    • Fiber link purchasing could be launched immediately; budget code of SPS Beam Dynamics used; Brennan asked to proceed with the purchasing;

Round Table

  • HWC - GH needs 2.5 days in the tunnel
  • Cable replacement planned for week 2 in January; cable is cut, EN-EL planned to install this during night, budget will be on EPC budget code;
  • Brennan: meetings for next year; will carry on after next year, frequency still to be seen, first meeting second week after restart; 6th
  • David: LS2 works and ISTs successfully completed; keys handed over to OP;
  • Etienne; SBDS installation completed; access to ECA5 needed regularly; ECA5 is decoupled
  • Giulia and Gerd: Tuesday in the tunnel with very good setup; all pickups were tested, all is working and in shape

 

 

There are minutes attached to this event. Show them.