GIF++ installation and schedule meeting

→ Europe/Zurich
Remote only (CERN)

Remote only

CERN

Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN), Federico Ravotti (CERN)
Zoom Meeting ID
93342061050
Host
Martin R. Jaekel
Useful links
Join via phone
Zoom URL
There are minutes attached to this event. Show them.
    • 11:00 → 11:05
      New Announcements 5m

      IMPACT Declarations 2021 : 

      For 2021, please prepare a new request, with "GIF - Irradiation 2021" as intervention period.
      If you clone the one from 2020, please review the description and the participant list !

      You will need an active IMPACT to activate the DCM and enter the bunker.
      Strictly no access without IMPACT.
      List of active IMPACTS : PPE154

      Please update the label on your setup. (Needs to start with 16xx)
      ----------------------------------

      Annual User Meeting 2020 : 

      DATE : TUESDAY 26.01.2021
      We expect a report of your ongoing measurements, and outlook on what is needed during the rest or LS2 and  your plans for your 2021 beam requirements.
      Agenda currently finalised at.... : https://indico.cern.ch/e/GIF-AUM-2020

      Missing speaker :  CDM-DT,  Eco-Gas, ATL-RPC !
      Additions to the agenda ??? - Please  contact Martin

      ----------------------------------

      CALL for Muon Beam Time  : 

      North Area Physics : 12.July to 14.November 2021
      All requests for Muon beam time at the GIF++ facility has to be send to  
      GIFPhysics.Coordinator@cern.ch 
      (Martin)

      So far received : EP-DT, ATL-MM.

      Deadline : FRIDAY 22.01 !!
      ----------------------------------

      F-Gas Inventory - EP : 

      Usage at large experiments known.
      In case you use F-gas in your lab for small setups or R&D - please contact Roberto Guida !!

      ----------------------------------

      Annual Irradiator Maintenance :

      Not possible to do it in the first week of 2021 due to additional travel restrictions.
      Will be rescheduled.

      ----------------------------------

    • 11:05 → 11:20
      Weekly planning 15m

      WILL BE UPDATED DURING THE MEETING !!!

      ----------------------------------

      Weekly Planning :   https://teamup.com/ksvh7dak8mub8k7xpe 
      UPSTREAM :          Default filter settings :  2.2 
      DOWNSTREAM :   Default filter settings :  1

      ----------------------------------

      ATLAS - MM :
      SM1-M31 long term chamber inside bunker since August. IC4H10 test ongoing.
      SA - access request for gas swapping (Ar-Co2) before removing chamber.
      3 long term chambers placed (on the ceiling) + 1 quad will be installed today THU 10th and swapped with the one that is currently inside.

      ATLAS - sTGC :  New chambers arrived, under test. New stand for flushing chambers before testing. Chambers arriving from Chile, not yet shipped. Some problems to solve with one chamber due to high impedance.

      ATLAS - sMDT :  Some noise problem currently under investigation (getting better). Gas quality will be changed from class II to class III (bottles ordered and expected next week)  

      CMS - CSC:  Issue with cooling - solved. Noticing some issue with the cooling inside the bunker. Progressing with the activity to resume everything after the long stop. 

      EP-DT1:   setup removed

      EP-DT2 :  System restarted. The aging test with eco-friendly gas mixture are going well. 

      CMS-DT:  Expected to return to bunker later / next year. INFN still blocking activity outside Italy. Preparing for the shutdown and most probably switch to low gas flow already today or tomorrow. 

      EcoGas:  New detector installed. Restarted yesterday. Test campaign resumed using standard mixture (R134a, iso-butane, and SF6).

      CMS-RPC: Radiation program resumed on trolley 1. Some impedance problem to solve on the new chambers. Gas kill signal that didn't work when the R134a- FIXED. Proposal to use 4.6 as default attenuation filter for one week - outside sTGC measurements.

      ATLAS-RPC: Coming back for the moment, not before March 2021.                       

       
       
       
       
       
       
       
       
       
       
       
       
    • 11:20 → 11:25
      New requests for tests at GIF 5m

      introduction, goal of the test, plan, needs

      BLM measuring campaign announced / ≈ 100 BLM, 6h approx. Week 45 (November 2nd till Friday 6th ). We will arrange everything in a way that the setup could be installed inside the bunker in the upstream area near ATL-sTGC setup    -> postponed until next year

      ----------------------------------

       
      Bulgaria academy of science -> testing of new type of radiation monitor system

      A new setup of ALICE-RPC will come. More news in coming weeks.

      Lab on Fiber (LOF) dosimeter

      Gas recuperation system to be installed - Responsible : Roberto
      4 additional racks in Gas Service area. One containing flammable gas.
      FG detection system to be installed, power needs to be provided.
      (DELAYED by a few months. Will be first installed in CMS, and only later come to GIF)

      EBT3 gafchromic film calibration campaign for CHUV irradiation in CLEAR scheduled for this Friday 06th from 11am to 08pm - DONE -
       
       
    • 11:25 → 11:30
      Long Term Planning 5m

      Schedule 2021 not yet clear.
      Current planned NA beam start : 12/07/2021
              Scenario (1+3) : proton beam until 11. Oct
              Scenario (2)     : proton beam until 15. Nov 
      Will be decided beginning of December, and reviewed in March 2021, approved in April

      Call for beam time in early December, deadline will be in February !

      ---------------------------------------------------------

      Gas usage at GIF :  we need to compile a table of gas mixture / consumption

      Gas training courses : ATEX level 1  and F-Gas training courses.
      List of trained people to be collected.

    • 11:30 → 11:35
      Infrastructure & Upgrades to the Facility 5m

      Improvements needed or planned for the facility.

      Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)

      - 2 chillers unit installed and in operation from yesterday 28/10. They have been installed in order to face the shutdown of the general cooling system of the entire EHN1 - general cooling system expected to be back end of January 2021

      - ATL-sTGC gas system went OFF multiples times last weeks. After investigation and different tests, it seems that the problem was due to a faulty flow cell. It has been replaced and since yesterday morning the system is running.  

      - R134a supply system went off yesterday Wednesday DEC 02nd around midday. It seems that the issue is the main pressure regulator form the building 909 (picture attached). The same problem happened again this morning Thursday DEC 03rd. EN responsible are aware and an action will be taken by the end of the day. On January 6th-7th 2021 we had again a similar problem with the R134a.                                                                                      After all this issues the system has been modified and a new panel with a new pressure regulator has been installed (13 Jan 2021), waiting for the overall renewal of the area 909. For the moment, the system it seems to work fine. In any case, we will monitor over the next weeks the status of the R134a line. 

       

       

       
       
       
       
       
    • 11:35 → 11:40
      General Items 5m
      • IMPACTs for 2021 5m

        Guidelines for filling in IMPACT requests

        List of active IMPACT declarations : https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154

        General Guideline : One IMPACT per setup.

        • two chambers on individual supports -> 2 IMPACT declarations
        • multiple chambers swapped on same or similar support -> one IMPACT declaration
        • basically, if you need two locations, please make two IMPACT declaration (clone)

        Each Setup should have IMPACT label attached with number.
        Attached documents : CAD file  or  picture.
        Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).

      • CoVid-19 5m

        CoVid-19 Risk Assessment for the Facility :  https://edms.cern.ch/document/2376286/1

        General guideline :

        • ONE setup to enter the bunker at any given time.
        • All presence at the GIF and access to the bunker needs to be announced via Teamup beforehand (!)
        • Traceability of people on site :  Logbook ! - List all the people you encountered.
    • 11:40 → 11:55
      AOB 15m

      No AOB this week