LIU-SPS Coordination Meeting
LIU-SPS Machine Coordination Meeting 20/01/2021
Present: Alexandre Lasheen, Andy Butterworth, Brennan Goddard, Danilo Quartullo, David Mcfarlane, Elena Chapochnikova, Kiki Veyrunes, Etienne Carlier, Federico Roncarolo, Francesco Maria Velotti, Gerd Kotzian, Giulia Papotti, Hannes Bartosik, Heiko Damerau, Ivan Karpov, Ivan Romera Ramirez , James Ridewood, Johan Dalla-Costa, Johannes Bernhard, Kevin Shing Bruce Li, Leandro Intelisano, Luciana Kolbeck, Tom Levens, Verena Kain, Wolfgang Hofle, Yannick Le Borgne
Matters arising and actions
- VSC storage of some coating samples under vacuum not yet followed up; to be checked with team --> Chiara will look into this
- High intensity scrubbing coating strategy for LS3; still open and needs to be folded into the schedule for 2023
- Can't have both long and short ion cycle in the SC, as too long, OP will look at longer term removal of this limit (SPS-OP)
- Does RF need to have another discussion on margins and interlock thresholds for power/voltage requirements? Elena asked to cross check the values of thresholds --> next follow-up scheduled for 3rd February
- Supercycle preparation: June 2021: short ion test cycle past transition
- OP to come up with a plan on how to continue the transverse damper integration
- Check with BI: budget confirmed for Timpix3 BGI 22/23?
- Final WS limit numbers for Q20 450 GeV, 26 GeV, emittance, intensity and wire speed. Empirical formula for WS application.
- Protection strategy for WS - to be revisited by T. Levens
Equipment protection of SPS emittance measurement devices: wirescanner & BSRT & BGI (F. Roncarlolo)
Federico summarised the damage potential and protection requirements for the various profile measurement systems in the SPS. For the BSRT, it is the camera intensifier that must be protected. The existing self-protection based on photo-cathode current reading and switch off of MCP is not sufficient. Beam needs to be dumped in addition to protect photo-cathode. He summarised also the critical settings to be adjusted per beam configuration. Feed forward protection can be included that is based on monitoring of image saturation level, but can only act on next cycle. Currently planned to use safe settings for the various users. Will not allow for dynamic switching of intensity for a given user and useful BSRT measurements.
For the BGI, it is also photo-cathodes that can be damaged. Slight improvement from end of run 2 with programmable MCP HV ramp at the start of selected users. Usability of system anyway limited due to optical PSF. Limited to 10 profiles per cycle. Aim at YETS 2022-23 to switch to new Timpix3 technology a la PS: radiation hard, no high intensity limitations, no PSF.
The new wire scanners will not be able to withstand 288 LIU bunches at 450 GeV. The limits are being revisited and the final numbers will come in the coming weeks. In software certain checks can be carried out i.e. in the application. But this will not be fail safe. Francesco asked whether number of bunches is of concern, or rather total intensity alluding to FT beams. Federico replied that it is total intensity.
Main concern for BI for BSRT and BGI is failing software, this is less critical for the wire scanner. Ideally beam information could be exploited directly in frontend for self-protection. Such a system is not in place. Possible makeshift solutions are being investigated. Could the evaluation of the FBCT @ start ramp be used for this purpose? Eric mentioned that he is looking into publishing BQM/BCT results at start ramp via the SIS.
SPS goals for 2021: LIU, FT, efficiency (K. Li, V. Kain)
Verena presented the goals for 2021 that had been established in discussion with the SPS coordinators and Stephane. Goals are formulated in terms of beam parameters as well as measures to increase efficiency and flexibility. Elena mentioned that cycle-to-cycle reproducibility needs to figure as well, along with goals for bunch length at SPS extraction. She also remarked that in case the "bonus" goal for FT is not easily reachable (97% transmission), then it should be studied why: e.g. 915 MHz HOM,...
Round table
Kevin mentioned that the distribution list for this meeting has been updated in view of the upcoming SPS challenges.