Present: Alexandre Lasheen, Andy Butterworth, Anthony Rey, Antonio Grande Mallavia, Arthur Spierer, Brennan Goddard, Carlo Zannini, Chiara Pasquino, Christine Vollinger, Christos Zamantzas, Danilo Quartullo, David Mcfarlane, David Nisbet, Elena Chapochnikova, Eric Montesinos, Kiki Veyrunes, Etienne Carlier, Fabio Follin, Francesco Maria Velotti, Francois-Xavier Nuiry, Frank Gerigk, Gerd Kotzian, Giovanni Rumolo, Giulia Papotti, Gregoire Hagmann, Hannes Bartosik, Heiko Damerau, Ivan Karpov, Ivan Romera Ramirez , James Ridewood, Johan Dalla-Costa, Johannes Bernhard, Julie Coupard, Kevin Shing Bruce Li, Leandro Intelisano, Loic De Oliveira, Luciana Kolbeck, Maciej Suminski, Marine Gourber-Pace, Nicolas Magnin, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Simon Albright, Stephane Cettour Cave, Tom Levens, Verena Kain, Wolfgang Hofle, Yannick Le Borgne

Matters arising and actions

  • Damper integration update today, as well as RF interlocks
  • Federico on equipment protection: no sufficient self-protection of BSRT, similar for BGI; needs to be some protection in addition
  • Look into timepix BGI upgrade - budget --> ACTION: Tom to clarify with Federico; Tom following up internal discussions - update next week
  • SPS goals for 2021 - summarizing goals for all teams involved with SPS commissioning and operations; updated goals with specific remarks included are published on Indico page; includes also some info on availability (equipment failure - fixed now at 85% availability concerning faults); availability with regards to tuning and setting up, i.e., efficiency would also be good;

Update on RF power interlocks implementation (Andy Butterworth)

  • HW implementation - brief overview
  • Power clamping at different time scales present in new system; beam interlocks to protect Thales power system against reverse power; fats interlock crate re-implemented in FC to replace two legacy systems;
  • HW to be received towards end of Feb; can still assemble the whole thing with what is in stock;
  • Reference clock selection inhibits injection: HW ready, FW produced and in test phase; FESA class (reference clock selection - maskable?) under development by Anthony;
  • FE overvoltage interlock: FE HW
  • Important to imagine interface - how to follow up; dates?
  • Would be good to get a conceptual overview over the interlock interfaces (systems, acquisition, control?) - date here? Clock selection, FE protection?
  • Can anyone of these be masked?
  • Interlock crate will have FESA interface; masking not proposed for the moment;
  • Anthony is in direct contact with Eric and Fabio on this; this is being followed up;
  • Might get a FESA interface towards end of month for the VME crate; diagnostics will be available then as well;
  • Simulated power levels will be looked into separately; PB: how will OP know what triggered the beam dump? Diagnostic will be part of FESA class for beam dump crate which will give status of different inputs; most of times this will be because of amplifier; would be nice to provide an interlock tree to provide which system actually; --> ACTION: get back to this towards end March!
  • Pickup FE interlock is purely HW interlock;

SPS 200 MHz field regulation during ramp using rigid bunch model (Philippe Baudrenghien)

  • Simulation input parameters; bunching factor is 0.93 which is probably reasonable at extraction but conservative towards beginning of of cycle;
  • Dynamics is rigid bunch model -- can we say something about the impact of soft bunches? Is this better or worse in terms of power limits?
  • Phase deviation along 72 bunch batch +- 6 deg; phase compensation subject to transient effects; power required for regulation: 13 % and 15.4% margin for 1MW and 1.6MW power at cavity entrance;
  • Power required during ramp: 3 and 4 section cavities; SS for compensating BL without transients (middle of batch), most power required towards second part of ramp; large spread when considering spread along batches; we get little margin but looks like we are within power limits on paper; not comfortable in terms of margins;
  • New algorithm to allow for more flexibility when there is no beam; can not do something similar to LHC full-detuning as this would lead to non-equidistant spacing between bunches; but we can relax regulation outside of beam segment; this would minimize peak requested power; what we have now should do the job for the next years; better algorithms can be implemented thanks to the flexibility of the new uTCA platform; who will do this?
  • Rigid bunch model? Conservative? - looks accurate with what Ivan has done; Elena says that 2.3 e11 as assumption; injected beam will be closer to 2.6 e11; --> get new number of for this; put 2.4e11 towards end of ramp; - ACTION: to do this with operational number to know how far out of ramp we are - Philippe;
  • Who will do the new algorithms? ES: are we not assuming to have 0 voltage outside beam segment? If we don't go down to zero, will this still fit into; Eric did calculation for power with 10 kW; should look into this after start up; -- ACTION: Philippe and team to look into this;
  • Alex: question for power at injection... very first point gives very high power, where does this come from? PB: This point is a simulation artifact, RB model has now value at injection;

Power considerations with longer cycles (Ivan Karpov)

  • ACTION: Kevin to get in touch with Ivan for power curves!
  • Slower ramp helps RF power but compromises transverse stability; idea would be to stretch only second part of cycle, keeping the first part as used in 2018;
  • Problems were up to 100 GeV; idea was to make initial part longer to reduce capture losses; empirically found that this part is difficult!
  • Longer cycles will lead to loss of duty cycle; this could be used as reasonable solution - ES suggests to immediately add 1.2 s for nominal LHC cycle --> ACTION: Kevin to organize meeting to prepare cycle!

ABO: Planning for SPS damper integration (Kevin Li)

  • Is this a possibility for OP?
  • Application: would have to have this added; about 1 week
  • Acquisition should become more robust; VTU crate; setting this up is key!

Round Table

  • New student who joined and will hale with MD tools;
  • DQ: blow up in the future
  • Saftey clearence needs to be obtained; being followed with HSE;

 