Conveners
FCCIS WP3 (Integrate Europe)
- Friedemann Eder (CERN)
The FCC infrastructure is based on a 90 to 100 km circumference tunnel, connected via more or less regularly spaced access shafts with up to 12 surface sites. Placement of this infrastructure needs to take into account the underground geological conditions, territorial and environmental constraints as well as the physics performance that can be reached with the colliders. Final optimisation...
Currently excavated material from tunnel construction in EU countries and Switzerland is treated as "waste". In accordance with applicable law, waste is to be disposed of if it is not sent to the end of the waste. The process to obtain the end of waste is not followed in most cases, as it is administratively and technically demanding and is therefore associated with considerable costs. As a...