Thermosiphon Low Temperature Commissioning on Detector

Europe/Zurich
40/4-C01 (CERN)

40/4-C01

CERN

30
Show room on map
Michele Battistin (CERN)
Description

Discussion for the definition of the thermosiphon low temperature test on detector

    • 16:00 16:05
      Introduction 5m
      Speakers: Dave Robinson (University of Cambridge (GB)), Michele Battistin (CERN)
    • 16:05 16:15
      Presentation of the low temperature test plan 10m
      • Run on compressors
      • Swap to TS at the same pressure (temperature)
      • Reduction of the TS pressure
      • Reduction of the BPR pressure (temperature to be defined with you – minimum value could be 1 bar(a) @ BPR -> probably -25°C on detector)
      • Run on detector at low temperature for 1-2 hours
      • Rise of the BPR pressure
      • Rise of the TS pressure
      • Swap from TS to compressors
      Speaker: Martin Doubek (Czech Technical University (CZ))
    • 16:15 16:30
      Discussion about Pixel and SCT temperature set points 15m
    • 16:30 16:45
      Definition of the test date 15m