Speaker
Dr
Jordan Nash
(Imperial College)
Description
Detector upgrade plans and schedule for the experiments, and their alignment with planned LHC upgrade. Constraints and requirements from the experiments on the proposed upgrade scenarios with crab cavities, early separation with D0 dipole, and large Piwinski angle scheme. Planned civil engineering and upgrade work around IP's 1 and 5 that could have synergies or conflicts with a crab-cavity installation.
Author
Dr
Jordan Nash
(Imperial College)