Zoom URL

Present: Alexandre Lasheen, Andy Butterworth, Arthur Spierer, Brennan Goddard, Carlo Zannini, Christine Vollinger, Danilo Quartullo, David Mcfarlane, Elena Chapochnikova, Etienne Carlier, Francesco Maria Velotti,  Giulia Papotti, Gregoire Hagmann, Hannes Bartosik, Heiko Damerau, Ivan Karpov, Kevin Shing Bruce Li, Leandro Intelisano, Marine Gourber-Pace, Reyes Alemany Fernandez, Tom Levens, Verena Kain, Zisou Charilaos

Matters arising and actions 

- ACTION - A. Butterworth: provide update on interlock interfaces along with available diagnostics (interlock tree - what triggered the dump?) - system delivery expected by March;

- ACTION - P. Baudrenghien: update simulation results with input parameters from operational scenarios, i.e., injected beam will be 2.6e11, 2.4e11 towards end of ramp; calculation for power with 10 kW outside beam segments; new algorithms for power optimization;

- ACTION - Kevin: Organize meeting to prepare stretched cycles for power reduction;

- ACTION - Kevin, Reyes, Giulia and Theo: look at parameter model of slip stacking to be implemented in LSA (e.g. duplicate RF voltage parameter);

- ACTION - keep following up on MKP potential high voltage issue.

- ACTION - Verena: test MDSH trigger of SBDS failure during injection

- ACTION - Alex: put team  (or working group) together to first define program for when to do what on the machines and then for analysis and discussion of results. 

- ACTION  - Verena, Johan, Kevin: logging for TT10 power converters - solution?

- ACTION - Verena: update 2021 goal list with PS-SPS transfer loss reduction goals

Status of Machine protection commissioning (V. Kain)

  • Quick overview of protection systems
  • Quick focus on new injection interlocking linking SPS beam permits with SPS injection kickers and PS BHZ; complex arming sequence, which was presented; last moment that still can be aborted it 350 ms before injection, due to BHZ permit (beam would go onto the TPSJ); start of TSU arming sequence is 460 ms before injection;
  • MDSH pulsing reaches reference just in time; EPC tuned current loop dynamic response --> improved, reference crossed at -30 ms
  • FII: permit needs to be given -350 ms before injection; working well
  • TED interlocking: new TED flag to protect from LIU beams; limit at 3.3e13 via SMP; update of flags is at start flattop and is kept for several seconds; details in logbook for January 21.
  • Etienne: did we test special failure mode if we have spontaneous injection, with distribution of beam with MDSH? There is a second evaluation 100 ms after injection, if the beam permit is false then, the MDSH will pulse and we will lose the beam on the aperture. This was not tested yet, but it is part of the list --> ACTION: plan test of this particular failure mode.

Status and outlook for PS-SPS transfer studies (A. Lasheen)

Alex summarised the progress with simulation in 2020 including the multi-harmonic feedback in the PS to better compensate beam loading and transients at injection in the SPS with "dynamic static" model of the impedance. Result: according to simulation, linearisation and usage of three 80 MHz cavities should improve the extracted distribution even at LIU intensities. To be clarified: potential microwave instability source seen in simulations in the PS. Propose to use machine learning and numerical optimisers for parameter tuning for RF phase adjustment etc. Question of halo generation during the PS cycle (uncontrolled blow-up during double splittings at flattop; intensity effects during bunch rotation; ?): end-to-end simulation now available in the PS should clarify the situation. Feedback modelling is being improved for SPS simulations. 

He also presented a list of MD studies in 2021: aperture measurement, optimisation of the bunch rotation in the PS; benchmarking of simulations in the SPS with measurements; characterisation of halo population in the PS (long. shaving)

Goals 2021: demonstrate that improved bunch rotation in the PS reduces losses at SPS injection; acquisitions for benchmark of simulations; characterisation of long. halo in PS; test automated optimisation routines. Tomography in the SPS

Goals run3: exploit PS WCM as PS BQM, UCAP automated tomography, generic opt routines and RL

Need: parallel MD cycle MD_36_L9600_Q20_2017 V1 (8BP) + long parallel MDs + 2 x dedicated MD (one of them at the end of the year)

Action Alex: put team  (or working group) together to first define program for when to do what on the machines and then for analysis and discussion of results. 

AOB:

  • Logging status (J. Dalla-Costa) Johan presented the status of the logging configuration. Very well advanced. Main issues with logging of TT10 PCs due to 2s shift of their functions. Also very good: tracking of logging checks in check lists. Action - Verena, Johan, Kevin: logging for TT10 power converters - solution?

Round table:

Kevin: COAST with RFFGs and transactional trims looking good now. 

Danilo: is including intensity effects for long emittance blow-up simulations. 

David M: main comments during LS2 postmortem: work site cleaning at the end of the campaign and issues with integration at the beginning of LS2 (was however already improved during LS2).

Etienne: MKP "enable" interlock will come out by the end of this week for OP to comment. 

Reyes: EE and EI magnet renovation going very well, will be finished in a few weeks from now. 