Present: Alexandre Lasheen, Andy Butterworth, Anthony Rey, Antonio Grande Mallavia, Arthur Spierer, Brennan Goddard, Carlo Zannini, Chiara Pasquino, Christine Vollinger, Christos Zamantzas, Danilo Quartullo, David Mcfarlane, David Nisbet, Elena Chapochnikova, Eric Montesinos, Kiki Veyrunes, Etienne Carlier, Fabio Follin, Francesco Maria Velotti, Francois-Xavier Nuiry, Frank Gerigk, Gerd Kotzian, Giovanni Rumolo, Giulia Papotti, Gregoire Hagmann, Hannes Bartosik, Heiko Damerau, Ivan Karpov, Ivan Romera Ramirez , James Ridewood, Johan Dalla-Costa, Johannes Bernhard, Julie Coupard, Kevin Shing Bruce Li, Leandro Intelisano, Loic De Oliveira, Luciana Kolbeck, Maciej Suminski, Marine Gourber-Pace, Michael Schenk, Nicolas Magnin, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Simon Albright, Stephane Cettour Cave, Tom Levens, Verena Kain, Wolfgang Hofle, Yannick Le Borgne, Zisou Charilaos

Matters arising and actions 

- ACTION - A. Butterworth: provide update on interlock interfaces along with available diagnostics (interlock tree - what triggered the dump?) - system delivery expected by March;

- ACTION - P. Baudrenghien: update simulation results with input parameters from operational scenarios, i.e., injected beam will be 2.6e11, 2.4e11 towards end of ramp; calculation for power with 10 kW outside beam segments; new algorithms for power optimization;

- ACTION - Kevin, Reyes, Giulia and Theo: look at parameter model of slip stacking to be implemented in LSA (e.g. duplicate RF voltage parameter);

- ACTION -Verena: keep following up on MKP potential vacuum issue;

- ACTION - Verena: test MDSH trigger of SBDS failure during injection;

- ACTION - Alex: put team  (or working group) together to first define program for when to do what on the machines and then for analysis and discussion of results. 

- ACTION  - Verena, Johan, Kevin: logging for TT10 power converters;

- ACTION - all: SPS goals updated, please check through list and send comments in case you have any in preparation for next week's IPP: https://indico.cern.ch/event/1003415/

- ACTION - Verena: add test of failure cases which came out of last week's talk on MP commissioning

- ACTION - WS team: get specification on max intensities / minimum emittances for the 2021 SPS beams;

- ACTION - Ivan, Danilo, Giulia: get back to OP as soon as they can provide input in updating the LSA parameter model

- ACTION - Kevin: reach out to WS team for input on beam commissioning planning

First simulation results from controlled longitudinal blow-up (D. Quartullo)

  • Simulations overview over single bunch studies for long. blow-up over last 2 months 
  • Idea is to have algorithm to determine frequency band for long. blow-up that can be used operationally;
  • Simulations done with LSA functions from 2018 and realistic bunch distributions; significant bunch shortening during ramp, target bunch length would be around 1.65 ns; blow-up stops before 380 GeV - then, scraping at FT
  • Algorithm for frequency-band determination:
    • Bunch length at algorithm start
    • Bunch length target at flat top
    • Bunch length interpolation - work with generation of matched distributions, use Qs distribution with or without collective effects, f_up and f_down is determine from Qs; this gives f_up and f_down along cycle;
  • Different noise generation algorithms - varinoise faster and has been used operationally in the past; time-domain also available;
  • Blow-up simulations with and without collective effects gives bunch length evolution;
  • During simulations - noise strength scanned; increasing noise strength gives larger bunch length at flat top;
  • Bunch length evolution stay even with very large intensities!
  • Blow-up with proposed algorithm works in simulations for low as well as for extreme intensities
  • Current parameter model is ready for blow-up implementation
  • Computation of frequency bands is challenging! Need to be smart in finding optimized and faster algorithms; segmentation of blow-up period can already help speeding up, for example --> ML could be used; problem arises if BL doesn't follow; OP you would just set beam intensity and extraction bunch length; that should give you frequency band that makes sure that bunch length is constant, the rest is automatic; Bartek asked whether the test device is used for iterative finding of amplitude... Ivan was not using this device yet, bit it is possible. Greg asked what we will use for bunch length measurement; this will be the ABWLM with a sampling at 20 ms.

Update on TFB integration progress (M. Schenk)

  • Lots of pre-work already done;
  • System selector hierarchies have been established along with value generators and deployed to LSA NEXT; application under development;

Round Table

  • Francesco: usage of data for main quads, this doesn't look great; would be good to have a discussion, needs more measurements (hysteresis)
  • David McFarlane: 2 day TS coming up for next month, is this to be ran by David? Still under discussion... ACTION: for OP to clarify
  • Etienne: MKDV and MKDH conditioning is finished! Starting fast cycle and then trying to get out workaround and prepare for remote! Stephane to trigger meeting for this; this will be needed in a good week from now; then wil will need to decisde when to move to the real BIS;

AOB:

  • Software status: what is still missing? Verena Kain

    • Everything that needs to provide, but still a lot to be done for RF - FW still under development and some FESA classes not yet available, TFB ongoing, WS not there yet, spill correction still pending; other than that many thing
    • BPT first version out, but will need to adapt during first weeks of operation, optimizer coming in slowly
  • Update on new LHC cycle Stephane Cettour Cave

    • Updated cycle has been generated and is available under LHC_PILOT_Q20_2021_V1; current cycles was found to satisfy requirements and will be used for 2021 as the operational ramp for LHC-type cycles;

    • Elena asked whether we can use time for controlled emittance blow-up (inj time, end time, ); Giulia mentioned limit of blow-up would still be end of 380 GeV? RF to check! But almost 1.2 seconds gained also for blow-up. Verena said that the scarping was never systematically studies, his could surely be optimized;

  • Update: WS protection Tom Levens

    • First iteration with a big IF; must not have intensity limitations at any wire speed at injection with enough points per sigma at flat top for wire speed
    • To withstand full 288 LHC we need to go above 10 m/s! Brennan asked how this fits with specifications that was made; Federico replied that the calculations are based on models of calculations that were made earlier, these are all best estimates; 10 m/s is at the limit, with this one could always measure the full 288 bunches; the question is on the beam parameters to be expected.10 m/s could barely give the required resolution at flat top in H, in V this is more critical; it seems like maybe a refinement of the current strategy would be needed - need to provide input for WS team on max intensities and minimum emittances! More offline discussion needed!